Skip to content
Back to search

Germany – Construction work for water and sewage pipelines – Medienumverlegung -ID26157_Kor

Senatsverwaltung für Stadtentwicklung, Bauen und Wohnen, V M 1 - Vergabestelle für den Öffentlichen Hochbau - Referat V DGermanyPublished on Jul 26, 2026
30 days left

Description

For the construction of a new fire station, the site must be cleared. This includes the dismantling of all supply and disposal systems (separate construction measure "site clearance"). Therefore, the drinking water pipe and the rainwater and sewer drains for the buildings and facilities on the property should be rerouted outside the construction site of the planned fire station. This requires canal and pipeline construction work. This includes:

- Diversion work for the drinking water ring main, route length 182 m,

- Diversion work for the rainwater canal, route length 113 m,

- Diversion work for the sewer canal, route length 113 m.

CPV codes

Construction work for water and sewage pipelinesStorm-water piping construction workFoul-water piping construction workDrain-laying workWorks related to water-distribution pipelinesConstruction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders