Skip to content
Back to search
This tender has been withdrawn.

Czechia – Construction work – Dům Svobody Cheb

Ekonom Reality Universal (CZ), spol. s r.o.CzechiaPublished on Jul 22, 2026
Deadline passed

Description

The purpose of the public procurement is the reconstruction and extension of the existing building of the former hotel and the overall revitalization of the adjacent area with the aim of creating a modern accommodation facility. The subject of the public procurement is the execution of the work – the reconstruction and extension of the existing building No. 575/100 (hereinafter referred to as the “Work”). The Work will be carried out in accordance with the Documentation for the Execution of the Construction prepared by Ing.Arch. Jakub Kuthan, with its registered office at Spojovací 467, 25301 Hostivice, IČO 87577402, which forms Annex No. 2 to these tender conditions, and in accordance with the issued Decision No. MUCH 84534/202. The subject of the public procurement includes all the work and supplies, activities and actions necessary for the proper and timely execution of the Work as described in these tender conditions and their annexes. The precise specification of the subject of the public procurement and the technical conditions are set out in the documentation for the execution of the construction and the technical report, which form Annex No. 2 to these tender conditions (hereinafter referred to as the “DPS”) and in the blind list of construction works, supplies and services with a statement of quantities, which forms Annex No. 3 to these tender conditions (hereinafter referred to as the “list of construction works”). A detailed specification of the contractor's obligations is further set out in the draft contract for the work (hereinafter referred to as the “contract for the work”), which is Annex No. 1 to these tender conditions. The participant in the tendering procedure (hereinafter also referred to as the “participant” or “contractor”) will submit its price offer by completing the list of construction works. The offer will also include a draft construction schedule (see Section 3.4.5 of the tender conditions). The relevant ČSN EN ISO standards apply to the construction works that are the subject of the performance of the public procurement. The technical requirements of the products and construction works used are specified in the list of construction works, supplies and services with a statement of quantities and the design part of the project documentation. The technical standards (descriptions of the individual parts of the building) with the specification of the building-physical requirements and the technical parameters of the structures, technologies, products and materials and the user standards, which unambiguously set the qualitative parameters and the complete requirements for the final form of the building, are described in detail in the attached project documentation, or in the list of construction works, supplies and services with a statement of quantities and in the mandatory template of the contract for the work. All products used must comply with the relevant provisions of Act No. 22/1997 Coll., on technical requirements for products and on the amendment and supplement of certain laws. 2.5. Any necessary expropriations for the construction, excavation permits, relocations, marking of networks, etc., will be arranged by the contractor at its own expense, with the costs necessary for the arrangement and implementation of these activities and works being included in the offer price. The transport distances for the disposal of the excavated material will be determined by the contractor. The contractor is obliged to handle the excavated material in accordance with Act No. 541/2020 Coll., on waste, and the conditions set out in Annex No. 6 to these tender conditions. The contractor is obliged to familiarise itself with all generally binding legal regulations and valid standards relating to the subject of the performance of the public procurement before submitting an offer. The contractor is responsible for ensuring that the public procurement is performed in accordance with all generally binding legal regulations and valid standards relating to the subject of the performance of the public procurement. During the execution of the Work, i.e. during the implementation works, it is necessary to proceed in such a way as to continuously allow access for vehicles of the integrated rescue system, in particular vehicles of the fire and rescue service, vehicles of fire protection units and emergency medical services. The performance also includes the execution of other construction, earth and related works and supplies which are essential for the proper completion of the public procurement. When performing the public procurement, the selected contractor is obliged to ensure the complete and flawless complete execution of all construction and assembly works and structures including the supply of necessary materials, equipment essential for the proper completion of the operational Work and further the execution of all activities related to the supply of construction and assembly works and structures, the implementation of which is essential for the proper completion of the Work (e.g. site facilities, safety measures, etc.). The public procurement also includes engineering activities essential for the implementation of the construction. The construction is designed in accordance with the current legislation and respects the results of the surveys carried out to date. The implementation of the Work also includes: a) the preparation of documentation of the actual execution of the Work in written form, b) the provision of all necessary surveys required for the proper execution and completion of the Work, c) the provision and execution of all organisational and construction-technological measures for the proper execution of the Work, d) all work and supplies related to safety measures to protect people and property, e) the establishment, removal and provision of site facilities including connection to engineering networks, f) the disposal, disposal and storage of demolished materials and construction waste at a landfill including the fee for storage in accordance with the provisions of Act No. 541/2020 Coll., on waste, g) the restoration of all surfaces affected by the construction to their original state, h) the provision of work safety and environmental protection, i) the execution of the acceptance of the construction, j) the provision of all necessary tests, certificates and inspections according to ČSN and any other legal or technical regulations valid at the time of execution and handover of the Work, by which the achievement of the prescribed quality and prescribed technical parameters of the Work will be proven, care for non-transferred objects and structures of the building, their maintenance, insurance, etc., k) test protocols, inspection reports, certificates and documents according to Act No. 22/1997 Coll., on technical requirements for products and on the amendment and supplement of certain laws in the valid wording, declaration of conformity, list of recommended spare parts, prescribed protective and safety equipment, l) the obligation to take over the warranty and responsibility for guarantees, defects and shortcomings for the object. The contracting authority does not publish the estimated value of the public procurement.

CPV codes

Construction workConstruction work for lodging buildings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders