Poland – Construction work for waterways – Tor wodny na rzece Elbląg na odcinku od punktu P1 do punktu Port
Description
1. The subject of this contract is the construction works for the hydrotechnical infrastructure in the form of a waterway, including the construction of the waterway bed, dredging works and navigational marking for the future waterway and turning basin. 2. The subject of the contract is described in detail in the technical documentation for the Waterway on the Elbląg River from point P1 to Port, including: 1) Construction Project: a) Land development project b) Architectural and construction project (Elbląg River, Turning Basin) c) Technical project d) Technical specifications for the execution and acceptance of construction works 2) Geological and engineering documentation 3) Ferromagnetic survey report 4) Navigation analysis together with the navigational marking project 5) Water law permit 6) Decisions and permits: - Decision on environmental conditions for the project, ref.: WOOŚ.420.18.2025.AZ.17 - Decision on determining the location of the investment - Permit for the construction or use of artificial islands, structures and devices in Polish maritime areas - Permit of the Provincial Conservator of Monuments - decision ZW- 124/176/2025 of 16.04.2026 (pursuant to Article 176(1) points 3, 4, 5 of the Water Law) - deviation - decision WIN – II.7850.5.1.2026.KKO of 27.02.2026. 3. The documentation indicated in clause 2, together with the Description of the Subject of the Contract (OPZ), constitutes Annex No. 1 to the SWZ. 4. The works shall be carried out in accordance with the guidelines contained in the Description of the Subject of the Contract (OPZ), constituting Annex No. 1.1 to the SWZ, and in the decision of the Regional Director for Environmental Protection in Olsztyn of 27.03.2026, ref.: WOOŚ.420.18.2025.AZ.17 on environmental conditions for the planned project entitled: Waterway on the Elbląg River from point P1 to Port. 5. The conditions for carrying out the works and the obligations of the Contractor are specified in the Project Agreement, constituting Annex No. 2 to the SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 25 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 45 daysPublished on Nov 19, 2026
Poland – Construction work – Odbudowa infrastruktury wodno-kanalizacyjnej uszkodzonej przez powódź na obszarze Gminy Kłodzko.
"Wodociagi Gminy Kłodzko" sp. z o.o.PolandConstruction workEngineering design servicesWater-treatment plant construction workDeadline in 17 daysPublished on Nov 19, 2026
Poland – Multi-dwelling buildings construction work – Budowa budynków mieszkalnych wielorodzinnych nr 1 i nr 2 wraz z niezbędnymi urządzeniami budowlanymi na działkach 463/1 i 463/2 obręb 0012 w Koszalinie
Koszalińskie Towarzystwo Budownictwa Społecznego Sp. z o.o.PolandMulti-dwelling buildings construction workDeadline in 28 daysPublished on Nov 19, 2026