Skip to content
Back to search
This tender has been withdrawn.

Germany – Heating, ventilation and air-conditioning installation work – BLH, MidSommerland, Raumlufttechnik

Bäderland Hamburg GmbHGermanyPublished on Aug 25, 2026
Deadline passed

Description

Supply and installation of ventilation units, ventilation ducts and air outlets for the entire swimming pool including ancillary areas. Mainly consisting of the following components: Swimming hall units as supply/extract air system with recirculation and heat recovery, basement installation, partial dismantling for entry: 1 unit of 39,000 m³/h, 1 unit of 18,200 m³/h supply/extract air units with heat recovery, basement installation: 1 unit of 2,920 m³/h, 1 unit of 18,700 m³/h, 1 unit of 17,420 m³/h, 1 unit of 4,200 m³/h supply air units with heat recovery, roof installation: 1 unit of 5,610 m³/h supply air units: 1 unit of 3,500 m³/h, 1 unit of 2,250 m³/h 5,000 m² ventilation duct made of galvanised steel sheet 1,500 m² ventilation duct made of aluminium 3,200 m ventilation pipe in various dimensions 3 ventilation towers for fresh air and exhaust air various diameters: 1.4 and 2.2 m Various air outlets: slot diffusers, swirl diffusers, wide throw nozzles Insulation/Cladding: - 4,500 m² mineral wool/ rubber insulation (partially with sheet metal casing) for the ventilation ducts, - 135 m² L90-cladding of steel sheet ventilation ducts, - 25 m² L30-cladding of steel sheet ventilation ducts

CPV codes

Heating, ventilation and air-conditioning installation workConstruction work for swimming pool

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders