Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Generalplanung Buckower Damm Bestand

Berlinovo Immobilien Gesellschaft mbHGermanyPublished on Oct 01, 2026
No deadline given

Description

Project: General Contracting Agreement for Maintenance / Energy Renovation of the Building Envelope (Facade, Windows, Balconies, Roof + Canopies); Optimisation of the Heating System

Property: Apartment Complex 9 - Apartment

Location: 12349 Berlin, Buckower Damm 91, 93 / 109, 111, 113, 115 / 135, 137

The Berlinovo Apartment GmbH manages and operates the Apartment Complex at Buckower Damm 91 to 137 (WA 9). This was built in 1968 and consists of 3 blocks with 8 buildings/entrances and a total of 555 one-room apartments. The buildings at Buckower Damm 91 to 115 are four-storey; the buildings 135/137 are six-storey; all buildings are underpinned. Heating and hot water supply are provided by a gas boiler system located in the basement of building 135. The supply to the individual buildings is via district heating lines and substations. The roof surfaces, particularly of building 115 and 135/137, are in a dilapidated and renovation-requiring condition. The membranes are cracked, warped and, due to countless temporary repairs, can only be considered as a patchwork. On the roof surface of building number 115, the adjacent, already renovated roof structure of building 113 is additionally undermined by ingressing water. It is planned to equip all roofs with PV. Preparatory investigations/preparatory measures (pre-fitting) are to be provided for this purpose. The roofs will then be leased - according to the current status - to the Berlin energy company for the construction/operation and operation of the PV systems. After the availability of the preliminary design and possible renovation variants, the subsequent planning steps will be discussed and decided together with the client. The client's objective is to maintain the existing buildings for the coming years/decades in a modern and permanently rentable condition. Both economy and sustainability are the top priority. Essential tasks within the project:

• Energy renovation of the exterior envelope (insulating facade and renewing windows incl. building physics)

• Concrete repair facade/balconies

• Maintenance of individual - not yet renovated roofs (building 115, 135 and 137) and canopies; possibly reworking roof building 113

• Variant study on a possible optimisation of the heating system; possibly implementation

• Addressing the topic of "missing room closure of corridors in building 109 and 115" (fire protection)

• Pre-fitting PV / Involvement in leasing the roof surfaces (erection/operation PV by contractor)

• Advise/Involve/Assist in the application for grants

• Dividing the cost estimates into shares modernisation and maintenance (possibly necessary further subdivisions (e.g. activatable measures, for grants etc.))

• Optional: Investigating the relocation of the internally located RW drainage to the outside (facade)

The individual measures deemed necessary and/or sensible should be evaluated. Based on this, the actual construction target in phases 2 to 3 should be detailed with the client (modular principle).

Planned phased commissioning:

Stage 1: Performance phases 1 - 2 HOAI

Stage 2: Performance phase 3 HOAI

Stage 3: Performance phases 5 - 7 HOAI

Stage 4: Performance phases 8 - 9 HOAI

Planned timeframe:

• 2027 Planning services Lph 1 to 7 / Tendering construction services

• 2028 to 2030 Construction implementation; a block-by-block renovation is most likely

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural and related services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders