France – Gas supply mains construction work – Renouvellement des marchés de travaux gaz incluant des prestations de type : raccordement, branchement, astreinte, terrassement ponctuel, renouvellement de réseau sur la région Occitanie Méditerranée.

GRDFFrancePublished on Apr 27, 2026
No deadline given

Description

The works expected in the Occitanie Méditerranée area (grouping the departments of Aude, Gard, Hérault and Pyrénées Orientales) are related to the lots described below and according to the following abbreviations: TG = Network extension works TPG = Scheduled earthworks "small holes" BRT = New connection or disconnection of connection AS = Emergency earthworks (also called TPIS internally) SI = Network renewal works PE or steel or large projects (Ex: Moving works tram line Zepig: Elementary Intervention Zone Gas A Zepig contains several municipalities whose list is defined in one of the attachments. Lot 1 => - Object: TG-TPG-BRT-AS SI - Single Award - Max Commitment: 15,360,000.00 € - Standby Delays: Between 1 and 2 hours depending on the municipalities. - Zepig* concerned: TG-TPG-BRT-AS: ZEPIG Nîmes SI: ZEPIG Montpellier Est + Nîmes Lot 2 => - Object: TG-TPG-BRT-AS - Single Award - Max Commitment: 8,760,000.00 € - Standby Delays: Between 1 and 2 hours depending on the municipalities. - Zepig* concerned: ZEPIG: Montpellier + ZEPIG Clermont l'Herault + ZEPIG Sète Lot 3 => - Object: TG-TPG-BRT-AS - Single Award - Max Commitment: 8,400,000.00 € - Standby Delays: Between 1 and 2 hours depending on the municipalities. - Zepig* concerned: ZEPIG: Perpignan, ZEPIG Beziers, ZEPIG Narbonne, ZEPIG Carcassonne Lot 4 => - Object: SI - Single Award - Max Commitment: 18,960,000.00€ - Standby Delays: Between 1 and 2 hours depending on the municipalities. - Zepig* concerned: ZEPIG Sète, ZEPIG Montpellier Ouest, ZEPIG Clermont l'Herault, ZEPIG Beziers, Lot 5 => - Object: SI - Single Award - Max Commitment: 14,160,000.00 € - Standby Delays: Between 1 and 2 hours depending on the municipalities. - Zepig* concerned: ZEPIG Perpignan, ZEPIG Carcassonne, ZEPIG Narbonne The contracts will include a mutual assistance clause in case of failure of a contractor on an adjacent lot. Variants are allowed for decarbonised sites, there will also be a social inclusion clause. The following elements will be analysed during the tendering phase: - Economic and financial capacity with a minimum annual turnover (depending on the lots) on similar activities to the contract object during the previous year if positioned. - Technical and professional capacities (sizing of the company or agency, staff, 3 references of sites or contracts over the last 3 years). In addition, there are minimum requirements regarding the provision of specific technical skills/qualifications: - Possession of AIPR (Authorisation to Intervene Near Networks) - AIPR "Operator" in possession of an excavator on site (as of 01/01/2019, all excavators must have this AIPR). - AIPR "Supervisor" in possession of an employee designated per site If the candidate does not have all the required qualifications, they must present a subcontracting arrangement in this regard by providing the completed and signed DC4s with the prerequisites of the said subcontractor. A tenderer may not be awarded more than 2 lots. If a tenderer is likely to be awarded more than 2 lots, they will be awarded priority for the lots on which the maximum commitment is highest. If, after being awarded the 2 lots with the highest volume, the other lots for which they were also considered for award will suffer from a lack of success due to their exclusion, then and only then, to avoid this lack of success, they may also be awarded these lots. This is the only exception to the rule of a maximum of 2 lots per tenderer. Indicative forecast schedule: Tendering phase: Publication in the OJEU: 23/04/2026 Deadline for requests to participate: 21/05/2026 Selection of candidates following OJEU: 09/06/2026 Tender phase: Sending of the DCE (contract project, CDC, RC): 16/06/2026 Deadline for V1 offers: 27/07/2026 at 15h Selection of the shortlist for the presentation phase: 10/09/2026 Presentations: from 14/09/2026 to 25/09/2026 Deadline for V2 offers: Early October Selection of the shortlist: Mid-October Legal and financial negotiations: from 26/10/2026 to 30/10/2026 Provisional award: November 2026 Contracts start: 01/01/2027

CPV codes

Gas supply mains construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders