France – Architectural services for outdoor areas – Mission complète de maîtrise d'oeuvre pour la requalification façade à façade de l'intégralité de l'Avenue du Général de Gaulle
Description
The contract includes optional lots defined in the tender specifications. The details of the missions entrusted to the contractor are set out in the tender specifications. The services are paid for by lump sum prices. Comprehensive project management mission to transform Avenue du Général de Gaulle into a structuring axis of the city centre of Cayenne. The operation goes beyond a simple road resurfacing; it combines the requalification of public spaces, reorganisation of mobility, renovation of networks, adaptation to climate change, greening, improvement of commercial attractiveness and enhancement of heritage. The project management will produce all the studies up to the DCE in the firm lot, then, in the optional lot, provide assistance with the award of the works contracts, the VISA, the project management and the reception operations. The entire project is in line with the orientations of the Cayenne 2050 Guide Plan and is based on an integrated approach between urban planning, landscape, hydraulics and mobility.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Technical assistance services – Mission de prestation pour l'Unité de Gestion des Programmes du PEEB
Agence Française de DéveloppementFranceTechnical assistance servicesDeadline in 30 daysPublished on Nov 01, 2026
France – Topographical services – Constitution et mise à jour du PCRC sur le territoire de la Métropole Montpellier
Montpellier Méditerranée MétropoleFranceTopographical servicesDeadline in 30 daysPublished on Nov 01, 2026
France – Construction-site supervision services – Mission d’ordonnancement, de pilotage et de coordination pour la construction du commissariat de Police d’Aulnay-sous-Bois regroupé avec la CSI 93
Préfecture de Police de ParisFranceConstruction-site supervision servicesDeadline in 29 daysPublished on Nov 01, 2026
France – Engineering studies – Réalisation de Schémas Directeurs d’Assainissement des Eaux Usées pour diverses communes membre de la Communauté d'Agglomération de Nîmes Métropole
Communauté d'Agglomération de Nîmes MétropoleFranceEngineering studiesDeadline in 28 daysPublished on Nov 01, 2026