Germany – Construction work for buildings relating to education and research – Neubau Schulcampus Greifswalder Straße (SCG)
Description
On a former commercial site east of the Erfurt city centre, a new school campus, among other things, is to be created. The building plot forms the southern boundary of the "Greifswalder Straße residential quarter" which is in the planning stage and is bounded to the east by a future ring road and the railway embankment. To the south of the building plot, a neighbourhood supermarket will be located in the future, and to the west are the residential buildings of the "Hanseviertel". The three buildings of the sports hall, primary school and secondary school together form the building ensemble of the new school site at Greifswalder Straße. The contiguous building figure closes the block edge of the Greifswalder Straße residential quarter to the south. The building offset divides the plot into three open spaces, roof overhangs create weather-protected entrance areas and clearly legible addresses. The public path running north-south for pedestrians and cyclists is integrated into the access system of the campus. The connecting path, together with a forecourt, forms the spatially defined entrance situation of the sports hall and the primary school. The campus concept continues inside the buildings. Thus, due to the proximity of the two schools to each other, some functional areas can be used jointly. Synergies arise, in particular, in the areas of auditorium/canteen and parts of the administration and in the utility areas. The administrations of both schools are located on the ground floor at the respective facade, which allows a view of the associated schoolyard. Other special rooms such as workshops and student kitchens (primary school) or art, music and biology (secondary school) are also located on the ground floor. The respective community areas of the two schools are opposite each other on the ground floor, the intervening open space is covered. Thus, joint celebrations and events can also be implemented. In the upper floor of the primary school, apart from the PC room, only the learning worlds with linked differentiation areas are located. Outside of school hours, these spacious rooms are also available for use by a day-care centre. The uses are distributed in the three buildings as follows: Building A: Three-court sports hall with a hall dimension of 45.00 x 22.00 m with ground-floor ancillary rooms: 6 changing rooms, 3 sanitary areas and 3 equipment rooms. Building B: Primary school for 320 pupils and 30 teachers on 2 floors: Ground floor: canteen, auditorium, student kitchen, workshop and administration First floor: 8 large classrooms ("learning world"), 4 division rooms and a PC room Basement: Partial area: car park Building C: Secondary school for 600 pupils and 60 teachers on 3 floors: Ground floor: auditorium, administration, physics, music, art rooms. 1st floor: 12 classrooms, biology and MNT rooms 2nd floor: 12 classrooms, chemistry and MNT rooms. All further details can be found in the service description.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Structural shell work – Gebäude 38.2, Neubau Orthopädie-OP,Erd-, Verbau-, Infrastruktur- und Rohbau-, Dachabdichtungsarbeiten
Universitätsklinikum des SaarlandesGermanyStructural shell workEarthmoving workBuilding construction workDeadline in 22 daysPublished on Sep 14, 2026
Germany – Fire station construction work – Tiefbau und Verkehrsanlagen für den Neubau der Feuerwache Bargteheide
Stadt Bargteheide - Die BürgermeisterinGermanyFire station construction workSiteworksExcavating and earthmoving workDeadline in 27 daysPublished on Sep 14, 2026
Germany – Excavating and earthmoving work – Gewässerwiederherstellung Ahr, Teilprojekt ALT380 Hönningen-Liers Bauabschnitt 03 Liers Ortslage
Kreisverwaltung Ahrweiler - Stabsstelle Hochwasserresilienz und AufbaukoordinationGermanyExcavating and earthmoving workSoilSubsoilDeadline in 29 daysPublished on Sep 14, 2026
Germany – Structural shell work – Los 302 Rohbau
Landratsamt Mittelsachsen , Bautechnisches Gebäude- und LiegenschaftsmanagementGermanyStructural shell workDeadline in 7 daysPublished on Sep 14, 2026