Skip to content
Back to search

Poland – Construction work for swimming pool – Budowa basenu pływackiego w Piekarach Śląskich

Gmina Piekary ŚląskiePolandPublished on Nov 11, 2026
31 days left

Description

The subject of the contract is the construction of a complete covered sports swimming pool facility equipped with 8 swimming lanes of 25 m in length along with an additional, separate children's paddling pool, equipped with play equipment. The sports pool will be equipped with a movable floor for two swimming lanes, separated by a movable barrier from the rest of the swimming pool. The contract also includes the necessary remaining infrastructure of the pool building, in particular: sports, changing rooms, sanitary, communication, technical, technological, storage, social, and pool changing rooms and pool back-of-house (level -1: basement, pool technology, technical and technological back-of-house, pool hall, rooms, technical and technological installations and equipment, social rooms, level 0: pool hall, sanitary, changing, entrance, sports, social, level +1: technical, administration, level +2: roof, renewable energy sources). The building will be equipped with the necessary installations and equipment, in particular such as: sanitary, electrical, water and sewerage, ventilation, low-current, BMS, fire protection, technological, pool technology, lighting, evacuation, technical and renewable energy sources. As part of the task, the necessary land development must also be carried out, in particular parking lots, walkways, access roads, communication, land reinforcement, connections, installations, equipment, small architecture, green areas and the remaining necessary technical and accompanying infrastructure. 2. The detailed description of the subject of the contract is contained in Annex No. 7 to the tender documentation. 3. The requirements regarding accessibility for disabled persons have been taken into account by the contracting authority in the description of the subject of the contract, which is Annex No. 7 to the tender documentation. 4. Due to the lump-sum nature of the settlement, the description of the subject of the contract does not cover the subject of the works. 5. The contractor may entrust the execution of part of the contract to a subcontractor. 6. The contractor will be obliged to provide at least 5 years of warranty and guarantee for the entire subject of the contract, counted from the date of unconditional acceptance of the entire subject of the contract. 7. Main position according to the Common Procurement Vocabulary: CPV 45212212-5 Construction work for swimming pools. 8. The contract has not been divided into parts. Such an artificial division would be associated with the need to separate a coherent whole in the form of a large construction project covered by one land development and a single function. Additionally, this is indicated by the conditions of the Poland Deal program, from which the contracting authority obtains co-financing for the implementation of the contract. The contracting authority has received a Preliminary Promise covering the entire subject of the contract for the investment. In the event of a division of the contract into parts and failure of one of them, the contracting authority would face a loss of financing for the entire contract. The subject of the contract is the construction of a new facility, dividing the contract into parts for such an undertaking would cause difficulties in coordinating the actions of different contractors and could significantly increase the costs of implementing the contract. The division would threaten the achievement of the final effect within the set implementation deadline due to the distribution of responsibility among different contractors. Furthermore, the creation of a new facility as a result of the implementation of the contract is a condition for obtaining a permit for use. The subject of the contract constitutes a single whole in terms of technical, technological, quality and organizational aspects. 9. The deadline for binding the offer expires on 12 March 2027.

CPV codes

Construction work for swimming pool

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders