Skip to content
Back to search

Germany – Electrical wiring and fitting work – Elektrische Anlagen, 2024 KHK, Sanierung der Kunsthalle zu Kiel

Christian-Albrechts-Universität zu KielGermanyPublished on Oct 27, 2026
19 days left

Description

In the construction project, the following main components and scope of work will be carried out in the electrical installations trade: 1 central battery system (11 kW, single-phase) to supply approximately 360 safety and emergency sign lights of various types, 1 photovoltaic system with 125 modules (each at least 430 Wp) and 4 inverters (2 x 25 kW / 2 x 20 kW), 1 main building distribution board and 1 main HVAC distribution board as a fixed distribution board, 11 sub-distribution boards as fixed or wall-mounted distribution boards, approximately 630 m of cable trays of various widths with associated brackets, ladder racks and electrical conduit, approximately 82.5 km of installation cables (NYM-J) and approximately 1.3 km of power cables (NYY-J/NYCWY), over 500 safety socket outlets and switches and approximately 70 presence detectors for KNX-controlled room automation, 1 KNX building visualisation system with programming of 200 lighting scenes, approximately 570 LED luminaires for general lighting and over 500 spotlights and special luminaires (NV and high-voltage busbar systems) for exhibition lighting, various earthing and equipotential bonding components and approximately 330 fire, combination and soft shutters.

CPV codes

Electrical wiring and fitting work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders