France – Construction work for electricity power lines – Travaux d' extension des réseaux de distribution publique d’énergie électrique, du réseau d’éclairage public et génie civil du réseau de communications électroniques-.
Description
This procurement procedure concerns the extension of public electricity distribution networks, as well as works on public lighting and civil engineering networks for electronic communications in the municipalities that are part of the SDEV, from 1 January 2027 (or the notification date if it is later than this date) until 31 December 2030, renewable 3 times for a period of one year. The works related to the electrical network and the civil engineering of the electronic communications network concern all Vosges municipalities, except LA BRESSE. However, the works related to the public lighting network only concern the municipalities that have transferred this optional competence to the SDEV.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026