Skip to content
Back to search

Germany – Paving and asphalting works – Neubau u. Sanierung Grund- u. Mittelschule Laufen - Pausenhof mit Leitungsbau

Stadt LaufenGermanyPublished on Nov 18, 2026
26 days left

Description

Construction project: New construction and renovation of primary and middle school Laufen, renovation of courtyard with pipeline construction

Location: Kohlhaasstraße 4, 83410 Laufen

Planned execution period: 12.03.2027 to 14.05.2027

As part of the above construction project, the central courtyard area of the primary school must be created before the demolition of the existing gymnasium building. The scope of work initially includes the dismantling of the existing asphalt and concrete block paving areas including edgings as well as the building-side eaves strip with gravel bedding. The existing site with a height difference of approx. 1.50 m is to be re-profiled according to the planned height development by earthworks and land modelling. This includes soil removal, transport and proper disposal of excess soil material as well as the creation of the required frost protection and load-bearing layers. Furthermore, the measure includes the creation of a new rainwater and sewer including the required connecting lines as well as the laying of empty pipes for the underground power supply. Parallel to the primary school building, a new fire department access road in concrete block paving construction including edging with concrete edging stones will be constructed. In the central courtyard area, a play and movement area with different surface finishes will be created. The western part will receive a covering of large-format concrete block paving. The eastern part will be created as a play and movement area with EPDM plastic coating. The plastic coating surfaces will be structured by concrete block paving strips and edged with concrete edging stones. Within the EPDM areas, a new play equipment is to be installed. At the southern edge of the project area, natural stone blocks will be installed for land retention. All works are to be carried out taking into account the ongoing school operations and the associated requirements for construction site organisation, construction site safety and traffic safety. Completion of the described services is planned by 14.05.2027 at the latest.

CPV codes

Paving and asphalting worksFootpath construction workSurfacing work except for roadsPlayground equipmentFlatwork for children's play areaLandscaping workExcavating and earthmoving workDemolition, site preparation and clearance workFoul-water piping construction workConstruction work for sewage pipesDrainage and surface worksDrainage worksDrains construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders