Ireland – Building construction work – Mary Immaculate College - Tailteann T2 Building Gym
Description
The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office and the removal and replacement of existing lighting. Mechanical works include new air conditioning works, including new outdoor units, new ducting
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Ireland – Construction work – Request for Tender for Site Development Works for 12 Serviced Residential Sites (Croí Cónaithe) at Rooska, Lisdoonvarna, Co. Clare
Clare County CouncilIrelandConstruction workDeadline in 25 daysPublished on Nov 01, 2026
Ireland – General construction work for pipelines – New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
New Inn Group Water Scheme 2IrelandGeneral construction work for pipelinesConstruction work for water and sewage pipelinesPipelaying construction workDeadline in 16 daysPublished on Nov 01, 2026
Ireland – Refurbishment work – Refurbishment of Unit 11A and B located in the development of Watch House Cross Shopping Centre, Kileely, Limerick
National Council for Special EducationIrelandRefurbishment workBuilding construction workDeadline in 16 daysPublished on Oct 29, 2026
Ireland – Road construction works – Lighting and Road Upgrades Works, IDA Business Park, Finisklin Co. Sligo
IDA IrelandIrelandRoad construction worksCarriageway resurfacing worksInstallation of road lighting equipmentDeadline in 29 daysPublished on Oct 29, 2026