Skip to content
Back to search
This tender has expired.

Germany – Sanitary fixture installation work – Neubau Ilmenau Schule Deutsch Evern

Samtgemeinde Ilmenau(LK Lüneburg)GermanyPublished on Sep 27, 2026
Deadline passed

Description

General The planning of the drainage system is based on DIN 1986-100 and DIN EN 12056. The drainage fixtures are predominantly connected via individual and collective connection lines in pre-wall installations. In areas outside the pre-walls, the drainage pipes are laid, for example, in the floor structure, under the ceiling, and in the case of downpipes, with increased sound insulation measures. The main pipes will use KG 2000 pipe material. Grease Trap For greasy kitchen wastewater, the installation of a grease trap is planned. The grease separator will be located on the rear side of the building to ensure good accessibility for maintenance and cleaning work. A direct extraction system is planned for the grease trap. Lifting Station To discharge the wastewater into the public sewer system, a lifting station is required, as the main sewer line would arrive too low at the transfer shaft without a lifting station due to the grease separator. Wastewater Flow The wastewater generated is initially directed to the grease separator at a natural gradient. Following this, it is conveyed to the lifting station. After the lifting station, the wastewater is pumped to a higher level via a pressure pipe. Subsequently, the wastewater is directed to the public sewer system at a natural gradient. Ventilation To avoid negative pressure in the wastewater system, necessary areas; a total of 11; are ventilated through the roof. Ground Floor Drains: 1x Floor drain Room E.07 Prep. WC2 1x Floor drain Room E.05 Prep. WC2 1x Floor drain Room E.06.1 WC various 1x Floor drain Room E.07.1 WC2 1x Floor drain Room E.06 Changing WC 1x Floor drain Room E.24.1 WC4 1x Floor drain Room E.22 WC supervised 1x Floor drain Room E.22 VR WC3 1x Floor drain Room E.24 VR WC4 1x Floor drain Room E.23.1 WC various Upper Floor: 1x Floor drain Room 1.20 WC Central various 1x Floor drain Room 1.21 WC VR Central 2 1x Floor drain Room 1.32 Staff WC 1x Floor drain Room 1.20 WC Central supervised 1x Floor drain Room 1.29 Dispensing Kitchen 1x Floor drain Room 1.30 Scullery 1x Floor drain Room 1.12 WC LK 2 1x Floor drain Room 1.11.1 WC LK various 1x Floor drain Room 1.11 WC LK supervised 1x Floor drain Room 1.10 WC LK 1 1x Floor drain Room 1.18 Cleaning Supplies 1x Floor drain Room 1.19 WC VR Central 1 1x Floor drain Room 1.19.1 WC Central 1 1x Floor drain Room 1.21.1 WC Central 2 Note: The roof ventilation must be taken into account in the planning of the PV system. 412 Water Systems Drinking Water The minimum supply pressure provided by the supply company currently amounts to 5000 hPa, subject to final confirmation. The calculated required supply pressure for the construction project is approximately 3400 hPa. Thus, an adequate pressure supply is ensured; the installation of a pressure boosting system is not required. The drinking water pipe network will be made of corrosion-resistant stainless steel. The drinking water pipe is introduced into the building via the heating technology room in the basement. In this room, the main water meter and the central main shut-off valve are located. The pipe distribution within the technology room is designed as a freely accessible exposed installation. On the ground floor, the floor pipes are routed below the ceiling or within ceiling suspensions. The supply to the take-off points on the upper floor is via short pipe routes directly from the distribution pipes on the ground floor. To ensure regular water exchange in accordance with the applicable DIN and VDI guidelines, a suitable flushing device is planned at each take-off point. To ensure drinking water hygiene, a suitable water management system is planned. The necessary shut-off devices for zoning the system are planned in sufficient quantities. The implementation is carried out using cast iron fittings. The preparation of hot water is decentralised via electrically operated instantaneous water heaters. The pipe network is designed as a T-piece installation. The thermal insulation of the pipes is optionally carried out with mineral or rock wool or with closed-cell insulating material. In visible

CPV codes

Sanitary fixture installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders