France – Sewerage work – SECURISATION DU PR KERGULVEN : Création de deux postes de relevage et renouvellement des réseaux d’assainissement
Description
The works consist of the supply and installation of the equipment and structures necessary for the proper functioning of the system, namely:
• The creation of a PR to collect the wastewater from the village with a tank of at least 120 m3 (PR Tingoff)
• The creation of a PR to collect the wastewater from the Verouri Nevez housing estate (PR Verouri Nevez)
• The supply and installation of 775 ml of gravity network in the valley of the white water
• The supply and installation of 1470 ml of DN 150 pump-out pipe for PR Tingoff on the Hent Trebe path and the road of the castles in Plomelin
• The supply and installation of 970 ml of DN 75 pump-out pipe for PR Verouri Nevez, Kerfram path and road of the castles in Plomelin
• The asbestos removal of approximately 480 ml of asbestos cement DN125 network
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Rain-water basin construction work – A46S – Travaux de réhabilitation des bassins 434-1 / 434-2 et 619-1
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceRain-water basin construction workDeadline in 45 daysPublished on Nov 02, 2026
France – Solar panel roof-covering work – Contrat de concession de travaux pour le financement, la conception, la réalisation, l'exploitation et la maintenance de centrales solaires photovoltaïques en toiture de trois immeubles de la RIVP, en vue d'opérations d'autoconsommation d'électricité
Régie Immobilière de la Ville de ParisFranceSolar panel roof-covering workNo deadline givenPublished on Nov 02, 2026
France – Building construction work – Réhabilitation de la MAS des Alouettes - 4, rue Maurice Renard 51000 Châlons-en-Champagne - Relance suite infructuosité
NOV'HABITATFranceBuilding construction workWaterproofing workSmiths' waresDeadline in 30 daysPublished on Nov 02, 2026
France – Structural shell work – TRAVAUX R+1C CIRCUIT D'URGENCE BLOC OBSTETRIQUE
CENTRE HOSPITALIER D'AUCHFranceStructural shell workPaints and wallcoveringsPlumbing and sanitary worksDeadline in 27 daysPublished on Nov 02, 2026