Germany – Works for complete or part construction and civil engineering work – BLB NRW Bundesbau / Höxter / Hammerstein-Equord-Kaserne / Umbau techn. Bereich TEP 90 / Neubau von 2 Fahrzeughallen Totalunternehmer
Description
The project classified under the Taskforce Bundesbau is divided into the following project areas: 1) Infrastructure (media supply) and demolitions (not part of the TU service) Preparatory measures or clearing of the construction site 2) Halls + aprons of the halls (TU service, cumulative) Planning and execution based on a provided preliminary design with functional performance description Order description for TU in the usual field of activity - no infrastructure in the order - Free construction site incl. all supply lines available
TEP 90 is an ABC - defence system. The vehicle itself is a four-axle truck. This is equipped with three container-like modules. The individual modules enable extensive decontamination of people, materials and vehicles. Accommodation takes place in hall facilities for 36 (29+7) vehicles on the property. In addition, areas for decontamination, water treatment and sanitary facilities are located in the halls. The TU service includes the planning and construction of the vehicle halls including the hall aprons. The connection to the handover points (media/supply) defined in the site plan on the construction site is required by the contractor. The calculation can be based on a preliminary design provided to the bidder in the 2nd phase and a functional performance description. The preparatory work (especially infrastructure) required for the erection of the vehicle halls and the measures to be carried out after the erection of the new buildings in connection with the location (e.g. parking spaces, open spaces, ...) are considered separately under "pre-/post-construction measures" in the project and awarded separately. They are not part of the TU services advertised here. The following project goals are to be achieved with priority: - Ensuring a high quality standard, agreed with the user, in planning and construction (quality assurance) - Implementation of the current functional and spatial requirements of the user - Compliance with the cost and time frame
For the accommodation of the new TEP-90 vehicles, the new construction of two vehicle halls (08/18) in the barracks will be necessary. The location of the space program requires the use of large areas and is to be seen in connection with an overall development plan for the technical areas on the property. Components of the construction documents are the necessary demolitions, the adaptation and creation of the infrastructure as a prerequisite for the new construction of the two TEP90 vehicle halls with their aprons. For the start of construction of vehicle hall 18, there is a direct dependency on the completion of the new building "lecture hall and simulation building". Only after the completion of the new simulation building and the move can the existing hall 18 be demolished and the construction site prepared for the new construction of hall 18. The project schedule therefore provides for the construction of the two halls in two construction phases. The new construction of the simulation building, the demolitions of the existing halls and the preparation of the construction sites are outside the responsibility of the contractor, but must be taken into account as dependencies in the schedule. The handover dates shown in the schedule represent the current state of knowledge of the client, the contractor will be informed of any changes to the dates and must take these changes into account.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Siteworks – LWL - Förderschulzentrum, Bielefeld (Senne I); Ersatzneubau Opticusschule + Albratros; Baustelleneinrichtung; 26-249 E
LWL - Bau- und Liegenschaftsbetrieb (LWL-BLB)GermanySiteworksDeadline in 29 daysPublished on Nov 15, 2026
Germany – Construction work for pipelines, communication and power lines – T-02 Sanitär, Heizung, Lüftung, Kälte, Laborgasversorgung für den Neubau des LKA Sachsen-Anhalt
Leinemann & Partner Rechtsanwälte mbBGermanyConstruction work for pipelines, communication and power linesNo deadline givenPublished on Nov 15, 2026
Germany – Roof insulation work – Max-Planck-Institut für biologische Kybernetik in Tübingen-Erweiterung Institut (Neubau): Dach
Max-Planck-Gesellschaft Abt.IIIGermanyRoof insulation workLandscaping work for roof gardensDeadline in 29 daysPublished on Nov 15, 2026
Germany – Demolition, site preparation and clearance work – Abbruch Finanzamt (21940077 / Polizei Norderstedt / Neubau)
Land Schleswig-Holstein endvertreten durch Gebäudemanagement Schleswig-Holstein AöRGermanyDemolition, site preparation and clearance workDeadline in 29 daysPublished on Nov 15, 2026