Ireland – Pier construction work – Roonagh Pier - Repair and Upgrade Works
Description
Roonagh Pier has been undermined structurally over the passage of time and now requires to be upgraded and repaired. The works required will include the following elements of work. (This is a non-exhaustive list of the potential works elements.) • Piling through the existing pier structure and into solid bedrock below the pier structure • Provision of a new in situ reinforced concrete deck overlay slab to the pier over its full length • Repair and upgrading of berthing face • Repairs and upgrading to elements of the pier structure • Repair and upgrade of access steps for ferry boat berthing • Provision of new pier furniture, bollards, ladders, rings • Upgrade of general signage, services, power, water and public lighting • Temporary removal of pier crane and re installation on new pier deck surface The works are envisaged to be completed over a period of 8 months between September 2026 and the end of April 2027. It is envisaged that a minimum of 3 and maximum of 5 tenderers will be invited to tender for the repair and upgrade works contract.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Ireland – Construction work – Request for Tender for Site Development Works for 12 Serviced Residential Sites (Croí Cónaithe) at Rooska, Lisdoonvarna, Co. Clare
Clare County CouncilIrelandConstruction workDeadline in 25 daysPublished on Nov 01, 2026
Ireland – General construction work for pipelines – New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
New Inn Group Water Scheme 2IrelandGeneral construction work for pipelinesConstruction work for water and sewage pipelinesPipelaying construction workDeadline in 16 daysPublished on Nov 01, 2026
Ireland – Refurbishment work – Refurbishment of Unit 11A and B located in the development of Watch House Cross Shopping Centre, Kileely, Limerick
National Council for Special EducationIrelandRefurbishment workBuilding construction workDeadline in 16 daysPublished on Oct 29, 2026
Ireland – Road construction works – Lighting and Road Upgrades Works, IDA Business Park, Finisklin Co. Sligo
IDA IrelandIrelandRoad construction worksCarriageway resurfacing worksInstallation of road lighting equipmentDeadline in 29 daysPublished on Oct 29, 2026