Skip to content
Back to search

Germany – Sewage-treatment plant construction work – Abwasseranlage Oberthal Güdesweiler (104) - Sanierung der Kläranlage Güdesweiler und Erneuerung der Regenwasserbehandlung

Entsorgungsverband SaarGermanyPublished on Jul 29, 2026
47 days left

Description

Dismantling of the existing pond treatment plant and construction of a mechanical treatment plant with fine screen, circular sand trap, aeration tank (Biocos process), phosphate precipitation plant and sludge storage. Renewal of rainwater treatment with separator, rain overflow tank, throttle/inflow pump station, retention soil filter and outflow throttle. Construction of a functional building with an approximate usable floor area of 190 m² with workshop/storage, measurement room, WC room, NSHV/operational monitoring room, room for screen plant, room for sand trap, room for blower/compressor, room for service water system. The measure includes all services of building, mechanical and E/MSC engineering as well as technical building equipment, inter alia: - Demolition of reinforced concrete ca. 320 m³ - Excavation and disposal of soil masses ca. 10,000 m³ - Delivery and installation of replacement soil ca. 8,500 m³ - Asphalt works ca. 2,000 m² - Production of reinforced concrete ca. 900 m³ - Sheet piling ca. 700 m² - Complete demolition of operational building

CPV codes

Sewage-treatment plant construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders