Germany – Demolition work – Abbruch- und Rückbauarbeiten: Demontage der Stahlkonstruktion des vorhandenen Dachs am Mülheim Hbf
Description
Ruhrbahn GmbH (hereinafter Ruhrbahn, or the Contracting Authority) is a transport company in the Ruhr area, which ensures mobility in the cities of Essen and Mülheim by providing a public service contract. The subject of the procurement are in particular demolition and dismantling works as part of the renovation project at Mülheim Hauptbahnhof. The services advertised here include in particular the complete dismantling of the distribution level in two construction phases, including floor, wall and ceiling constructions, window and door systems, technical building equipment, cable systems and ventilation systems. All components, including substructures and fastening elements, must be dismantled professionally and disposed of in accordance with the applicable regulations. The dismantling of the facade and window systems includes the complete dismantling including frame constructions, claddings and ventilation grilles. At the same time as the dismantling, suitable fall protection measures must be installed. Furthermore, the measure includes the section-by-section dismantling of the existing roof including roof sealing, concrete slabs and steel construction (steel beams and supports) according to the specifications of the demolition concept. The dismantling of the existing roof will only take place after the complete construction of an emergency roof including functioning drainage. The renovation works at Mülheim an der Ruhr main station are carried out in two construction phases during ongoing operations. During each construction phase, the other construction phase must ensure unrestricted access to the platforms and the accessibility of the lift systems. The construction processes are to be organised accordingly and coordinated with the operational requirements of the Contracting Authority. The services include the preparation of a dismantling and disposal plan based on the demolition concept, as well as all necessary ancillary services (e.g. site establishment, safety measures, scaffolding, auxiliary constructions). All works must be carried out in compliance with the applicable safety, labour and environmental protection regulations. The specified execution time comprises approximately 12 months, with the work to begin in October 2026 according to the Contracting Authority's planning. Detailed information can be found in the schedule of services/ tender documents.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Landscaping work – Freianlagen Füssen
Stadt FüssenGermanyLandscaping workExcavating and earthmoving workBuilding demolition and wrecking work and earthmoving workDeadline in 31 daysPublished on Sep 03, 2026
Germany – Sanitary fixture installation work – Neubau Dreifeld-Sporthalle am Gymnasium Franziskaneum - LOS 23 -Sanitärinstallation
Stadt MeißenGermanySanitary fixture installation workSports hall construction workDeadline in 34 daysPublished on Sep 03, 2026
Germany – Heating, ventilation and air-conditioning installation work – Polizeirevier Werdau, Erweiterung
Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und VertragsmanagementGermanyHeating, ventilation and air-conditioning installation workDeadline in 31 daysPublished on Sep 03, 2026
Germany – Sanitary works – Neubau von Erweiterungsanbauten an der Franziskus Schule - Abwasser-, Wasser-, Gasanlagen
Kreis ViersenGermanySanitary worksPlumbing and drain-laying workDeadline in 31 daysPublished on Sep 03, 2026