Switzerland – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – EV Enge Submission Rohrleitungen
Description
Within the framework of the present submission, the first part of the pipelines for the EV Enge is procured. The submission comprises two lots, which can be offered individually or together: ▪ Lot 1: Intermediate circuit pipeline (PE pipeline) between seawater pump station, energy centre Bederstrasse and Hürlimann site (see Figure 1). ▪ Lot 2: District heating pipelines (KMR) within the EV Enge combined perimeter (first part of the entire district heating pipeline network shown in Figure 1). The EV Enge extends between Freigutstrasse to the north, Bahnhof Giesshübel / Üetlihof / Saalsportalle / Sihlcity to the west, Brunaustrasse to the south and the lake shore to the east. The supply perimeter of the EV Enge is shaded green in Figure 1. With this energy network, the Enge area is supplied with approximately 96% renewable energy from Lake Zurich.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Construction work – Neubau Kantonsschule Stein - BKP 271 Gipserarbeiten
Kanton Aargau - Departement Finanzen und Resourcen - Immobilien AargauSwitzerlandConstruction workDeadline in 55 daysPublished on Nov 25, 2026
Switzerland – Airport buildings construction work – VEB Verdrängungen B10 / B - BKP 244 Lufttechnische Anlagen
Flughafen Zürich AGSwitzerlandAirport buildings construction workDeadline in 57 daysPublished on Nov 25, 2026
Switzerland – Airport buildings construction work – BKP 272.2 Grobmetallbau
Flughafen Zürich AG - ELPSwitzerlandAirport buildings construction workDeadline in 48 daysPublished on Nov 25, 2026
Switzerland – Demolition, site preparation and clearance work – COLLEGE VOLTAIRE Bâtiment principal – rénovation au standard HPE Réno
Etat de Genève, Département du territoire - DT, Office cantonal des bâtimentsSwitzerlandDemolition, site preparation and clearance workDeadline in 50 daysPublished on Nov 25, 2026