Hungary – Sewage-treatment plant construction work – Szennyvíztisztító telep, hálózat, útépítés Dabason

Dabas Város ÖnkormányzataHungaryPublished on Sep 29, 2026
Deadline passed

Description

Task: The development of the wastewater collection and treatment system of Dabas city within a contract framework, including a minimum 6-month test operation period, and the performance of tasks falling within the warranty period. The design of the wastewater treatment plant and network development to be constructed has been completed under the KEHOP-2.1.3-15-2022-00105 support contract, therefore the FIDIC “Red” Book contractual structure will be applied. A preliminary examination procedure was necessary for the entire investment, which concluded with a decision (PE/KTHF/00172-15/2024 - environmental impact assessment not required).

Section 1: Construction of the wastewater treatment plant and irrigation field, network construction tasks

a) Construction of the wastewater treatment plant: The new plant will be built on the outskirts of Dabas, on the 0148/5-8 hrsz plot, as a new greenfield investment. The planned new wastewater treatment plant will handle Dabas city's wastewater, with an organic capacity of 30,670 PE, and a treatment capacity of 3,100 m3/day. Various structures, buildings, and technological facilities will be prepared on the design area. The new plant will apply SBR technology for wastewater treatment.

b) Establishment and renovation of the irrigation field: The new irrigation field will be established, which ensures the final disposal of the treated wastewater. The design documentation includes a treated wastewater main channel, a pressure pipe, willow filter beds, irrigation pans, drainage pipes, and a bypass branch. In addition to the existing 21.5 ha willow area, a further 27.5 ha willow wastewater irrigation will be established. Alongside the new settling ponds, the current, heavily degraded pans will be restored in a phased manner.

c) Construction of the sewer network and shafts (1st and 2nd gov. shafts to the wastewater treatment plant) (Not affected by trial operation) In this section, the fundamental task is to solve the transfer of the wastewater currently arriving through 4 existing collector pressure pipes to the new wastewater treatment plant to be established. As part of this, the following sewer sections will be built: the new lift shafts, the collector pipes (water management shafts) connecting the existing collector pipes, and the new lift shafts and the planned new wastewater treatment plant. The plans also include the construction of the water supply pipe for the network water supply of the planned wastewater treatment plant.

Section 2: Development of the wastewater network in the city (Not affected by trial operation) This section can be implemented independently of the 1st part, technically separated. On the one hand, it includes the expansion of the wastewater network of the Örkényi út and its surroundings (“Design of Dabas city's new wastewater treatment plant and related facilities, Design of wastewater network development related to Dabas city's new wastewater treatment plant, Design of wastewater network development in Dabas city, Örkényi út and its surroundings - construction design, Job number: 2024/T90” - folder named “Örkényi út wastewater network”). Gravity and pressure pipe sections will be built on the Örkényi út and Szőlő, Akácos, Rabárerdő, Venyige, Fenyves streets, with lift shafts and related facilities. Number of residential properties to be supplied: currently 254 properties. Total gravity sewer network and pressure pipes: 5,046 m. Sections to be built: E-Cs 16-0-0 gravity sewer (Örkényi út): 1,503 m – DN200 – KG-PVC E-Cs 17-0-0 gravity sewer (Szőlő street): 974 m – DN200 – KG-PVC E-Cs 18-0-0 gravity sewer (Rabárerdő street I.): 501 m – DN200 – KG-PVC E-Cs 19-0-0 gravity sewer (Rabárerdő street II.): 335 m – DN200 – KG-PVC E-Cs 20-1-0 gravity sewer (Fenyves street, Akácos street): 628 m – DN200 – KG-PVC E-Cs 20-2-0 gravity sewer (Rabárerdő street): 153 m – DN200 – KG-PVC E-Cs 21-0-0 gravity sewer (Rabárerdő street): 278 m – DN200 – KG-PVC E-Cs 22-0-0 gravity sewer (Fenyves street): 344 m – DN200 – KG-PVC E-Ny 4-0-0 pressure pipe (Rabárerdő street): 41 m – D110 PE E-Ny 5-0-0 pressure pipe (Fenyves street): 289 m – D90 PE Wastewater lift stations to be built: E-II. lift station, E-III. lift station

On the other hand, from the city wastewater network design documentation (“Design of Dabas city's new wastewater treatment plant and related facilities, Design of wastewater network development related to Dabas city's new wastewater treatment plant - construction design, VERSION NUMBER: V2, Job number: 2023/T/59” - folder named “City wastewater network”) tenders must be submitted for the following technical units: CS-1, CS-2, CS-3, CS-4, CS-5, NY-1, NY-2, E-NY 1-0-0, E-NY 2-0-0, E-NY 3-0-0, CS-NY-1, CS-NY-2, CS-NY-3, CS-NY-4, CS-NY-5, CS-NY-6, E-CS 20-0-0 pipes, Homok street lift station, E-I. lift station, 3545/2 Hrsz lift station (The design areas marked in blue on the “Overview site plan - tender breakdown” drawing) Number of residential properties to be supplied: currently 164 properties. Total gravity sewer network, pressure sewer network, and pressure pipes: 6,179 m.

Section 3: Construction of the access road to the site (Not affected by trial operation) The task is to implement the construction of the access road to the new Dabasi wastewater treatment plant, which is located in the current outskirts of the settlement, in the area between the 5th class main road and the 4604 j. national road, north of Dabas. The 0129 hrsz road has an asphalt pavement between the 0+000-0+350 km sections. The road enables access to the Alsóbesnyő settlement area of Dabas. The width of the existing road surface is generally 4

CPV codes

Sewage-treatment plant construction workSewer construction workRoad construction worksBuilding construction workStructures construction workElectrical installation workMechanical installationsDrainage canal construction work