Skip to content
Back to search

France – High voltage installation work – Aéroport de PARIS - Charles de Gaulle - Electrification du Terminal 2D contact

Aéroports de ParisFrancePublished on May 17, 2026
No deadline given

Description

This consultation concerns the project to electrify the 2D contact terminal at Paris-Charles de Gaulle Airport. As part of this project, the following services are to be carried out: - Deployment of electrical supplies for Air Pre-Conditioning (PCA) at the aircraft stands of the 2D contact terminal, - Creation of 2 new HT/BT stations, - Supply and installation of power cables for electric vehicle charging points, - Construction of multi-tubular networks for cable routing, - All preparatory work necessary for the installation of PCA (networks, cabinets, electrical supplies). All works are specified and detailed in the technical documents downloadable from the Spartacus portal. This consultation is for a single lot but is divided into 3 technical sub-lots defined as follows: - Electrical technical sub-lot - Infrastructure technical sub-lot - Building/HVAC technical sub-lot. The contractor will be the company responsible for carrying out the services of the electrical or infrastructure technical sub-lot.

CPV codes

High voltage installation workElectrical installation workElectrical wiring and fitting workElectrical wiring workElectrical fitting workInstallation services of electricity distribution equipmentEarthmoving work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders