Skip to content
Back to search

Poland – Construction work – Kontrakt W-1/R Modernizacja ujęcia wody gruntowej Mała Nieszawka.

Toruńskie Wodociągi Sp. z o.o.PolandPublished on Oct 18, 2026
9 days left

Description

The subject of the contract is the execution of works falling within the scope of Contract W-1/R Modernization of the Groundwater Intake Mała Nieszawka, in accordance with the Contractual Conditions for Building and Engineering-Construction Works designed by the Contracting Authority, fourth English-Polish edition 2008, translation of the first English original published in 1999 by the International Federation of Consulting Engineers (Fédération Internationale des Ingénieurs - Conseils - FIDIC), in particular: A. Works related to wells 2b/B, 13b/B, 3c/A, 4c/A, 5b/A including: a) supply and installation of pumps in wells with a rising main, wellhead, technological fittings and casing, b) hardening of the area under the casing of each well and hardening of the area for the needs of vehicles servicing the wells, c) execution of fencing for each well, d) execution of water supply connections for each well, e) execution of the power supply installation supplying the designed wells, f) execution of external power and control cables, B. Works related to wells 1/C, 2/C, 3/C, 4/C, 5/C including: a) supply and installation of pumps in wells with a rising main, wellhead, technological fittings and casing, b) hardening of the area under the casing of each well and hardening of the area for the needs of vehicles servicing the wells, c) execution of fencing for each well, d) execution of water supply connections for each well, e) execution of the power supply installation supplying the designed wells, f) execution of external power and control cables and the designed transformer station, g) reconstruction of the ventilation well at well 3/C. C. Construction of the raw water pipeline on the territory of UW Mała Nieszawka including: a) execution of the raw water pipeline with PE100 pipes with a nominal pressure of PN16, approximately 2849m in length, b) execution of nodes with fittings and fittings made of ductile cast iron for PN 16, c) execution of ventilation and drainage wells, d) execution of measuring wells with reinforced concrete rings and flow meters, e) reconstruction of the existing rainwater drainage system on the territory of SUW. 2. A detailed description of the subject of the contract is presented in Annex No. 1 to the Specification of Contract Conditions (hereinafter also: SWZ) – Description of the Subject of the Contract (hereinafter also: OPZ) together with its integral parts in the form of design documentation.

CPV codes

Construction workWells construction workConstruction work for water and sewage pipelinesTransformer substationErection of fencing

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders