Poland – Construction work – Wykonanie dokumentacji projektowej oraz robót budowlanych dla zadania pn.: " Przebudowa przepustów na mostki w Nadleśnictwie Lubaczów "
Description
3.1 Subject matter of the contract
3.1.1 The subject of the contract is the design, obtaining all the legally required permits and consents necessary to obtain a building permit and commence construction works, the execution of construction works based on the obtained documents, and the execution of a natural inventory before the commencement of construction works and after their completion for the task "Reconstruction of culverts on bridges in the Lubaczów Forest District".
3.1.2 The contract has been divided into parts:
Sub-task No. 1: Reconstruction of the culvert on the bridge in the Polanka Forest District
The scope of the works should include in particular:
• demolition of the existing culvert with reinforced concrete pipes fi 140 o dł. l=21.0 m, with the execution of the demolition of the end walls,
• demolition of the existing stone setts paving,
• execution of a new bridge structure – a steel span with a corrugated sheet construction,
• execution of the reinforcement of the end walls in the form of a stone setts,
• restoration of the stream bed with its possible reinforcement,
• execution of approaches with a bituminous surface before and after the object for a length of min 2 x 50.0 m
The width of the bridge should ensure the execution of the surface on the bridge with a width of min. 3.5 m and verges of 2 x 1.5 m, and its clearance will result from the calculations and agreements with the watercourse administrator and the obtained water law permit.
Sub-task No. 2: Reconstruction of the culvert on the bridge in the Dziewięcierz Forest District
The scope of the works should include in particular:
• demolition of the existing culvert with reinforced concrete pipes fi 60 o dł. l=25.0 m, with the execution of the demolition of the end walls and steel barriers,
• demolition of the existing stone setts paving,
• execution of a new bridge structure – a steel span with a corrugated sheet construction,
• execution of the reinforcement of the end walls in the form of a stone setts,
• restoration of the stream bed with its possible reinforcement,
• execution of approaches with a bituminous surface before and after the object for a length of min 2 x 50.0 m
The width of the bridge should ensure the execution of the surface on the bridge with a width of min. 3.5 m and verges of 2 x 1.5 m, and its clearance will result from the calculations and agreements with the watercourse administrator and the obtained water law permit.
Sub-task No. 3: Reconstruction of two culverts on bridges in the Krowica Forest District
The scope of the works should include in particular:
• demolition of the existing culvert with PP pipes fi 80 o dł. l=8.50 m, with the execution of the demolition of the end walls made of concrete, unnamed stream (tributary of Czerteż),
• demolition of the existing culvert with concrete pipes fi 60 o dł. l=9.50 m, with the execution of the demolition of the end walls made of concrete, Zamiło stream,
• demolition of the existing road structure on each object,
• execution of new bridge structures – a steel span with a corrugated sheet construction on each object,
• execution of the reinforcement of the end walls in the form of a stone setts on each object,
• restoration of the stream beds with their possible reinforcement on each watercourse,
• execution of approaches with a bituminous surface before and after the object for a length of min 2 x 40.0 m on each object.
The width of the bridges should ensure the execution of the surface on the bridge with a width of min. 3.5 m and verges of 2 x 1.5 m, and its clearance will result from the calculations and agreements with the watercourse administrator and the obtained water law permit.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Site-reclamation work – Wykonanie robót wynikających z nałożonego obowiązku ograniczenia oddziaływania na środowisko i jego zagrożenia oraz przywrócenia środowiska do stanu właściwego zachodniej części zwałowiska położonego przy szybie Leon II (decyzji naprawczej) dla PGG S.A. Oddział KWK ROW Ruch Rydułtowy
Polska Grupa Górnicza S.A.PolandSite-reclamation workDeadline in 36 daysPublished on Nov 19, 2026
Poland – Construction work for gas pipelines – Przebudowa gazociągu DN400 MOP 4,22MPa Sędziszów – Tarnów Mościce wraz z odgałęzieniami do stacji gazowych
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.PolandConstruction work for gas pipelinesDeadline in 43 daysPublished on Nov 19, 2026
Poland – Construction work – Przebudowa budynku Urzędu Skarbowego w Krośnie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Krośnie przy ul. Składowej 5”.
Izba Administracji Skarbowej w RzeszowiePolandConstruction workDismantling worksStructures construction workDeadline in 9 daysPublished on Nov 19, 2026
Poland – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Realizacja zadania pn.: „Rewitalizacja Parku Lisiniec w Częstochowie – III etap – Budowa strefy rekreacji Pacyfik w Parku Lisiniec”, polegającego na zaprojektowaniu i wykonaniu robót dla zadania prowadzonego w systemie „zaprojektuj i buduj”.
Gmina Miasto CzęstochowaPolandConstruction work for buildings relating to leisure, sports, culture, lodging and restaurantsBuilding demolition and wrecking work and earthmoving workExcavating and earthmoving workDeadline in 23 daysPublished on Nov 19, 2026