Hungary – Sewage-treatment plant construction work – Szennyvíztisztító telep, hálózat, útépítés Dabason
Description
Task: Development of the sewerage and wastewater treatment system of Dabas town under a contract, including a minimum 6-month test operation period, and performance of tasks within the warranty period. The design of the new wastewater treatment plant and network development has been completed under the KEHOP-2.1.3-15-2022-00105 support contract, therefore the FIDIC „Red” Book contract structure will be applied. A preliminary examination procedure was necessary for the entire investment, which concluded with a decision (PE/KTHF/00172-15/2024 - environmental impact assessment not required). 1. SECTION: Construction of wastewater treatment plant and irrigation field, network construction tasks a.) Construction of wastewater treatment plant: The new plant will be built on the outskirts of Dabas, on the 0148/5-8 hrsz plot as a new greenfield investment. The planned new wastewater treatment plant will treat the wastewater of Dabas, with an organic load capacity of 30,670 PE, and a treatment capacity of 3,100 m3/day. Various structures, buildings, and technological facilities will be constructed on the design area. The new plant will apply SBR technology for wastewater treatment. b.) Establishment and renovation of irrigation field: The new irrigation field will be established, which ensures the final disposal of the treated wastewater. The design documentation includes a treated wastewater main sewer, pressure pipeline, irrigation basins, irrigation channels, drainage pipelines, and bypass. In addition to the existing 21.5 ha irrigation area, a further 27.5 ha will be established for wastewater irrigation. Alongside the construction of the new settling ponds, the current, heavily degraded basins will be restored in a phased manner. c.) Construction of sewer network and manholes (1. and 2. main sewerage manholes to the wastewater treatment plant) (Not affected by test operation) The main task in this section is to solve the transfer of the wastewater currently arriving through 4 existing collector pressure pipelines to the new wastewater treatment plant. In this context, the following sewer sections will be constructed: the new transfer manholes, the collector pipelines (sewerage manholes) connecting the existing collector pipelines, and the new transfer manholes and the planned new wastewater treatment plant connecting pressure-operated collector main pipelines (dual pipelines). The plans also include the construction of the drinking water pipeline supplying the network of the planned wastewater treatment plant. 2. SECTION: Development of the sewer network in the town (Not affected by test operation) This section can be implemented independently from the 1st part, technically separated. On the one hand, it includes the expansion of the sewer network of the Örkényi út and its surroundings (“Design of Dabas town's new wastewater treatment plant and related facilities, Design of sewer network development for Dabas town's new wastewater treatment plant, Design of sewer network development for Örkényi út and its surroundings in Dabas town - construction design, Job No.: 2024/T90” – folder named “Örkényi út sewer network”). Gravity and pressure-operated pipeline sections will be constructed on Örkényi út and Szőlő, Akácos, Rabárerdő, Venyige, Fenyves streets, with transfer manholes and related facilities. Number of residential properties to be served: currently 254 properties. Total gravity sewer network and pressure pipelines: 5,046 m. Pipeline sections to be constructed: E-Cs 16-0-0 gravity sewer (Örkényi út): 1,503 m – DN200 – KG-PVC E-Cs 17-0-0 gravity sewer (Szőlő street): 974 m – DN200 – KG-PVC E-Cs 18-0-0 gravity sewer (Rabárerdő street I.): 501 m – DN200 – KG-PVC E-Cs 19-0-0 gravity sewer (Rabárerdő street II.): 335 m – DN200 – KG-PVC E-Cs 20-1-0 gravity sewer (Fenyves street, Akácos street): 628 m – DN200 – KG-PVC E-Cs 20-2-0 gravity sewer (Rabárerdő street): 153 m – DN200 – KG-PVC E-Cs 21-0-0 gravity sewer (Rabárerdő street): 278 m – DN200 – KG-PVC E-Cs 22-0-0 gravity sewer (Fenyves street): 344 m – DN200 – KG-PVC E-Ny 4-0-0 pressure pipeline (Rabárerdő street): 41 m – D110 PE E-Ny 5-0-0 pressure pipeline (Fenyves street): 289 m – D90 PE Sewage transfer stations to be constructed: E-II. transfer station, E-III. transfer station On the other hand, the following technical units must be tendered from the town's sewer network design documentation (“Design of Dabas town's new wastewater treatment plant and related facilities, Design of sewer network development for Dabas town's new wastewater treatment plant - construction design, VERSION NO.: V2, Job No.: 2023/T/59” – folder named “Town sewer network”). CS-1, CS-2, CS-3, CS-4, CS-5, NY-1, NY-2, E-NY 1-0-0, E-NY 2-0-0, E-NY 3-0-0, CS-NY-1, CS-NY-2, CS-NY-3, CS-NY-4, CS-NY-5, CS-NY-6, E-CS 20-0-0 pipelines, Homok street transfer station, E-I. transfer station, 3545/2 Hrsz transfer station (The design areas marked in blue on the “Overview site plan - tender breakdown” drawing) Number of residential properties to be served: currently 164 properties. Total gravity sewer network and pressure sewer network and pressure pipelines: 6,179 m. 3. SECTION: Construction of the access road to the site (Not affected by test operation) The task is to construct the access road to the new Dabasi wastewater treatment plant, which is located in the current outskirts of the settlement, in the area between the 5th class main road and the 4604 j. national road, north of Dabas. The 0129 hrsz road has an asphalt pavement between the 0+000-0+350 km sections. The road provides access to the Alsóbesnyő part of Dabas. The width of the existing pavement
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Hungary – Construction work – Gellért fürdő feladógépházának felújítása (nyílt)
Budapest Gyógyfürdői és Hévizei Zrt.HungaryConstruction workBuilding demolition and wrecking work and earthmoving workWorks for complete or part construction and civil engineering workDeadline in 31 daysPublished on Nov 19, 2026
Hungary – Construction work – Új Közlekedési Múzeum kivitelezési beruházása
Közlekedési és Beruházási MinisztériumHungaryConstruction workLandscaping workWorks for complete or part construction and civil engineering workNo deadline givenPublished on Nov 19, 2026
Hungary – Railway construction works – Katonai rakodók létesítése
MÁV Magyar Államvasutak Zártkörűen Működő RészvénytársaságHungaryRailway construction worksEngineering servicesInstallation of safety equipmentDeadline in 10 daysPublished on Nov 18, 2026
Hungary – Construction work for buildings relating to health – Szentesi Multidiszciplináris Centrum felújítása
Szegedi TudományegyetemHungaryConstruction work for buildings relating to healthDeadline in 20 daysPublished on Nov 18, 2026