Skip to content
Back to search
This tender has been withdrawn.

Poland – Solar panel roof-covering work – Wykonanie, dostawa i montaż instalacji fotowoltaicznych wraz z magazynami odnawialnych źródeł energii na części wysokiej poddasza budynku Ministerstwa Finansów - realizacja w formule zaprojektuj i wybuduj

Ministerstwo FinansówPolandPublished on Sep 27, 2026
Deadline passed

Description

2.1 The subject of the contract is the design, delivery and installation of photovoltaic systems along with renewable energy storage on the high attic of the Ministry of Finance building, in a design and build formula. 2.1.1 The subject of the contract includes: 2.1.1.1 Preparation of the Project Documentation in the scope of: 2.1.1.1.1 Technical Design; 2.1.1.1.2 Architectural and Construction Design; 2.1.1.1.3 Land Development Design – if required. 2.1.1.2 Support of the Contracting Authority by the Contractor in the scope of: 2.1.1.2.1 administrative proceedings before MWKZ at each stage of obtaining a decision permitting the works; 2.1.1.2.2 administrative proceedings before BAiPP at each stage of obtaining a building permit; 2.1.1.2.3 at each stage of obtaining a decision approving the solutions adopted in the Project Documentation. 2.1.1.3 Delivery, execution and successful commissioning of the complete photovoltaic installation, in accordance with the Project Documentation and the decision permitting the works. The installation will be handed over to the Contracting Authority in a fully operational state, ready for exploitation. Scope of works: segments B1, D1, E1’ (13, 21, 12 PV panels). 2.1.1.4 Delivery, execution and successful commissioning of the complete photovoltaic installation, in accordance with the Project Documentation and the decision permitting the works and the Contracting Authority's requirements. The installation will be handed over to the Contracting Authority in a fully operational state, ready for exploitation. Scope of works including segments D2, D3, B2 (17, 24, 13 PV panels). 2.1.1.5 Making all the notifications and reports required by law regarding the photovoltaic installation, including the notification of a micro-installation to the competent Distribution System Operator (DSO) and the notification to the competent local Fire Brigade. 2.1.1.6 Delivery, installation and commissioning of the monitoring and management system for the photovoltaic installation. 2.1.1.7 Supervision of technical and author's supervision, in accordance with the Construction Law, over the execution of the works in order to ensure the compliance of their execution with the design and legal regulations. 2.1.1.8 Preparation of the As-Built, Instructional and Operational Documentation in accordance with the requirements and guidelines indicated in the Functional and User Requirements (FUR), which is Annex 1 to the PPU. 2.1.1.9 Conducting training on the operation and exploitation of the installed photovoltaic installation. 2.1.2 The detailed scope of works, requirements and manner of execution of the works, conditions of contract implementation, as mentioned in clause 2.1.1 are defined by the Draft Contract Terms (hereinafter “PPU”) which is Annex I to the SWZ and the Functional and User Requirements (hereinafter “FUR”) which is Annex 1 to the PPU.

CPV codes

Solar panel roof-covering workSolar installationEngineering design servicesConstruction workSolar photovoltaic modulesElectrical installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders