Skip to content
Back to search

Romania – Construction work for school buildings – Execuție lucrări pentru realizarea obiectivului: „Construire imobile cu funcțiunea de liceu, dotări sportive, cămin, cantină, spații de conferințe, spații conexe, amenajare incintă și împrejmuire – Colegiul Tehnic de Poștă și Telecomunicații «Gheorghe Airinei»”, finanțat prin Programul național de investiții „Școli sigure și sănătoase”

SECTORUL 6 AL MUNICIPIULUI BUCURESTIRomaniaPublished on Nov 10, 2026
39 days left

Description

Sector 6 of Bucharest Municipality, in order to comply with the local development strategy, implement the investment list and in accordance with the financing contract provisions, has initiated a public procurement procedure aimed at contracting the works necessary to achieve the investment objective: "Gheorghe Airinei Postal and Telecommunications Technical College", with the design theme being the construction of buildings to allow the conduct of classes in the morning for all students, and in the afternoon dedicated to extracurricular activities for the development of social skills, creativity and sports abilities. The specific requirements of the works have been presented in the terms of reference and the technical-economic documentation, an integral part of the award documentation, published together with the participation notice no. CN1090263/03.03.2026. The public procurement procedure was cancelled due to numerous inaccuracies in the technical documentation, numerous requests for clarification and objections received up to the deadline for submission of tenders. The technical-economic documentation has been revised, as well as the procedural documentation, in accordance with the clarifications received and through the present contracting strategy, the new public procurement procedure is based, which is to be published in the SEAP, together with the participation notice. The name of the investment objective inscribed in the building permit, in the technical project, in the drawing titles and in some administrative documents may include references to the implementation of connections, the relocation of the transformer station and the placement of heat pumps. For the unitary and comparable preparation of tenders, the Contracting Authority specifies that: • The final electrical connection, the relocation/supply/equipment/connection of the transformer station and the deviation or protection works of utilities expressly excluded through the final documentation are not the subject of the Contract; for the other connections and connections, including water, sewerage, gas and communications, the inclusion, limits and obligations of the Contractor are established exclusively through the final forms F3–F4, the technical project, the applicable approvals and specific clarifications; their exclusion is not presumed. • The relocation, supply, equipment and connection of the transformer station are not the subject of the present public procurement procedure and will be ensured separately, by the care of the Contracting Authority; the graphic representations regarding the expressly excluded works are used only for information, coordination and delimitation of the technical interfaces. • Heat pumps and VRF systems are part of the technical solution of the installations and will be supplied, assembled, connected, tested and put into operation in accordance with the technical project, the technical sheets and the final forms F3–F4; • Interior networks and installations, as well as networks within the site up to the delimitation points established through the technical documentation, are part of the subject of the contract; • Temporary supplies and utilities necessary for site organization are the responsibility of the Contractor and will be included in the site organization costs. The technical details regarding the investment objective can be found in the PT.-D.E, an integral part of the award documentation that will be uploaded to the SEAP at the time of publication of the participation notice. The number of days within which clarifications can be requested before the deadline for submission of tenders: 19 days. Clarifications requested after this deadline will no longer be considered. The contracting authority will respond clearly and completely to all requests for clarification/additional information, on the 11th day before the deadline set for the submission of tenders.

CPV codes

Construction work for school buildingsBuilding construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders