This tender has been withdrawn.

Poland – Architectural, engineering and planning services – Opracowanie wielowariantowej i wielobranżowej koncepcji budowy linii tramwajowej Cichy Kącik - Azory wraz z niezbędną infrastrukturą techniczną oraz uzyskaniem decyzji o środowiskowych uwarunkowaniach

Zarząd Inwestycji Miejskich w KrakowiePolandPublished on Aug 19, 2026
Deadline passed

Description

The subject of the contract is the development of a multi-variant and multi-sectoral concept for a two-track tram line approximately 1.7 km in length, which is intended to connect the existing tram line from Bronowice with the existing tram line from Cichy Kącik on the section between the existing tram-bus loop Cichy Kącik and the intersection of ul. Piastowska with ul. Podchorążych/ul. Bronowicka, as well as the preparation of materials necessary to submit an application for an Environmental Decision (DUŚ) and to obtain the final Environmental Decision (DUŚ) on behalf of the Contracting Authority for the resulting variant. 2. Additionally, as part of the subject of the Contract, a new tram-bus loop must be designed on the site of the existing southern car park (from ul. 3 Maja) at Synerise Arena Kraków (Stadion Miejski im. Henryka Reymana) or in the area of the intersection of ul. Buszka with ul. Piastowska. 3. As part of the implementation of the subject of the contract, the Contractor is obligated to develop at least 2 variants of the tram line route based on the routes proposed by the Contracting Authority: 1) Variant I – a line running from the existing tram-bus loop Cichy Kącik along ul. Piastowska to the intersection with ul. Podchorążych/ul. Bronowicka and a new tram-bus loop on the site of the existing southern car park (from ul. 3 Maja) at Stadion Miejski im. Henryka Reymana (Synerise Arena Kraków). 2) Variant II – a line running from the existing tram-bus loop Cichy Kącik along ul. Piastowska to the intersection with ul. Podchorążych/ul. Bronowicka and a new tram-bus loop in the area of the intersection of ul. Buszka with ul. Piastowska. The contract is implemented as part of the investment task no. ZIM/ST6.2/20 entitled „Construction of the tram line Cichy Kącik – Azory”. 4. The subject of the contract has been divided into the following stages: Stage I – development of a multi-variant and multi-sectoral concept along with the preparation of materials necessary to submit an application and submission on behalf of the Contracting Authority of an application for the issuance of the Environmental Decision (DUŚ) confirmed by notification from the competent authority of the commencement of administrative proceedings for the issuance of the Environmental Decision (DUŚ); Stage II – obtaining the Environmental Decision (DUŚ) along with the submission of an application for the granting of immediate enforceability to this decision; Stage III – obtaining the final Environmental Decision (DUŚ) and delivering the final version of the concept for the variant indicated in this decision, in accordance with the scope of the concept. 5. A detailed description of the subject of the contract and the scope of the Contractor's obligations have been specified in the appendices to the SWZ, including in the Draft Contractual Provisions (hereinafter referred to as PPU), constituting Annex no. 1 to the SWZ and in the Description of the subject of the contract (hereinafter referred to as OPZ), constituting Annex no. 1 to the PPU and annexes to the OPZ made available in the form of a link. NOTE: In each place where a Polish Standard PN is indicated or quoted, the Contracting Authority allows equivalent standards, in accordance with Article 101(4) of the Pzp Act.

CPV codes

Architectural, engineering and planning servicesEngineering design services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders