Poland – Architectural, engineering and planning services – Opracowanie wielowariantowej i wielobranżowej koncepcji budowy linii tramwajowej Cichy Kącik - Azory wraz z niezbędną infrastrukturą techniczną oraz uzyskaniem decyzji o środowiskowych uwarunkowaniach
Description
The subject of the contract is the development of a multi-variant and multi-sectoral concept for a two-track tram line approximately 1.7 km in length, which is intended to connect the existing tram line from Bronowice with the existing tram line from Cichy Kącik on the section between the existing tram-bus loop Cichy Kącik and the intersection of ul. Piastowska with ul. Podchorążych/ul. Bronowicka, as well as the preparation of materials necessary to submit an application for an Environmental Decision (DUŚ) and to obtain the final Environmental Decision (DUŚ) on behalf of the Contracting Authority for the resulting variant. 2. Additionally, as part of the subject of the Contract, a new tram-bus loop must be designed on the site of the existing southern car park (from ul. 3 Maja) at Synerise Arena Kraków (Stadion Miejski im. Henryka Reymana) or in the area of the intersection of ul. Buszka with ul. Piastowska. 3. As part of the implementation of the subject of the contract, the Contractor is obligated to develop at least 2 variants of the tram line route based on the routes proposed by the Contracting Authority: 1) Variant I – a line running from the existing tram-bus loop Cichy Kącik along ul. Piastowska to the intersection with ul. Podchorążych/ul. Bronowicka and a new tram-bus loop on the site of the existing southern car park (from ul. 3 Maja) at Stadion Miejski im. Henryka Reymana (Synerise Arena Kraków). 2) Variant II – a line running from the existing tram-bus loop Cichy Kącik along ul. Piastowska to the intersection with ul. Podchorążych/ul. Bronowicka and a new tram-bus loop in the area of the intersection of ul. Buszka with ul. Piastowska. The contract is implemented as part of the investment task no. ZIM/ST6.2/20 entitled „Construction of the tram line Cichy Kącik – Azory”. 4. The subject of the contract has been divided into the following stages: Stage I – development of a multi-variant and multi-sectoral concept along with the preparation of materials necessary to submit an application and submission on behalf of the Contracting Authority of an application for the issuance of the Environmental Decision (DUŚ) confirmed by notification from the competent authority of the commencement of administrative proceedings for the issuance of the Environmental Decision (DUŚ); Stage II – obtaining the Environmental Decision (DUŚ) along with the submission of an application for the granting of immediate enforceability to this decision; Stage III – obtaining the final Environmental Decision (DUŚ) and delivering the final version of the concept for the variant indicated in this decision, in accordance with the scope of the concept. 5. A detailed description of the subject of the contract and the scope of the Contractor's obligations have been specified in the appendices to the SWZ, including in the Draft Contractual Provisions (hereinafter referred to as PPU), constituting Annex no. 1 to the SWZ and in the Description of the subject of the contract (hereinafter referred to as OPZ), constituting Annex no. 1 to the PPU and annexes to the OPZ made available in the form of a link. NOTE: In each place where a Polish Standard PN is indicated or quoted, the Contracting Authority allows equivalent standards, in accordance with Article 101(4) of the Pzp Act.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Architectural, construction, engineering and inspection services – "Pełnienie nadzoru inżynierskiego nad realizacją projektu wykonawczego branży srk oraz kompleksowych robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów-Szczyrzyc" w ramach Projektu pn.” Budowa nowej linii kolejowej Podłęże-Szczyrzyc-Tymbark/Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka-Nowy Sącz – Etap II
PKP Polskie Linie Kolejowe S.A.PolandArchitectural, construction, engineering and inspection servicesConstruction supervision servicesSupervision of building workDeadline in 11 daysPublished on Nov 19, 2026
Poland – Engineering design services – Opracowanie koncepcji wraz z kompletnymi materiałami do wydania Decyzji o Środowiskowych Uwarunkowaniach dla zadania pn. „Budowa wiaduktu nad linią kolejową nr 009 w Iławie w ciągu dk nr 16”
Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w OlsztyniePolandEngineering design servicesDeadline in 47 daysPublished on Nov 19, 2026
Poland – Architectural services for buildings – KWP Katowice – modernizacja budynków A, B, C, etap I z przystosowaniem do przepisów przeciwpożarowych budynków KWP w Katowicach przy ul. Lompy 19
Komenda Wojewódzka Policji w KatowicachPolandArchitectural services for buildingsEngineering design servicesDeadline in 8 daysPublished on Nov 19, 2026
Poland – Engineering-design services for traffic installations – Opracowanie projektu wykonawczego na budowę sygnalizacji świetlnej wraz z pełnieniem nadzoru autorskiego
Zarząd Dróg Miejskich w WarszawiePolandEngineering-design services for traffic installationsSupervision of building workDeadline in 30 daysPublished on Nov 19, 2026