Spain – Flood-prevention works – Contratación de servicios para protección frente a inundaciones en el Barranco de la Saleta. Tramo 2, Aldaia Vía Verde, Valencia.
Description
The objective of the Project is to reduce the risk of flooding in the municipalities involved, primarily in Aldaia and Xirivella, by channeling the floods from the Barranco de la Saleta, caused by heavy rainfall at its source, and directing them to the new channel of the Turia River. This will allow for the environmental connection of the final section through the proposed greenway, and increase the current level of protection against flood risk. The actions included in the Project include the environmental adaptation of the Barranco de la Saleta, a channeling that begins at the height of the CV 410 at the entrance to Aldaia, to its industrial area and the Bonaire shopping centre, an underground diversion conduit under the industrial estate and skirting the urban centre of Aldaia, and a greenway of open section on land from downstream of the roundabout connecting Aldaia, Xirivella and Alaquas and the vicinity of the EDAR Quart Benager for its delivery to the new channel of the Turia River. This is the sum of the solutions proposed in the projects Drenaje del Barranco de la Saleta a su paso por Aldaia and Quart de Poblet and Vía verde de conexión del barranco de la Saleta con el río Turia, Valencia, adapted to the present day, which will be included under a single project. The planned actions are part of the Programme of Measures of the Flood Risk Management Plan, PGRI, of the Second Cycle of the Júcar River Basin District, approved by Royal Decree 26,2023, of 17 January, where they are listed under the heading Acondicionamiento del Barranco de La Saleta. Section: Aldaia New channel of the Turia, and are included in the Plan for the recovery and improvement of resilience to floods in the territory affected by the DANA in the Comunitat Valenciana. These works are considered to be of general interest, in accordance with Annex II of the National Hydrological Plan approved by Law 10,2001, of 5 July, under the headings: Restoration and adaptation of the natural channels of the Barranco del Poyo. Phase I, and Restoration and adaptation of the natural channels of the barrancos of Torrente, Chiva and Pozalet.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Spain – Hire of construction and civil engineering machinery and equipment with operator – Conclusión del Acuerdo Marco para la contratación de las obras Acuerdo Marco para el arrendamiento de maquinaria autopropulsada con conductor Gerencia de Teruel.
Empresa de Transformación Agraria S.A.,S.M.E., M.P., (TRAGSA)SpainHire of construction and civil engineering machinery and equipment with operatorDeadline in 14 daysPublished on Nov 19, 2026
Spain – Construction work – OBRAS DE MANTENIMIENTO CORRECTIVO Y ACTUACIONES URGENTES EN LAS PRESAS Y POZOS DE CANAL DE ISABEL II, S.A., M.P.
CANAL DE ISABEL II, S.A., M.P.SpainConstruction workDeadline in 53 daysPublished on Nov 19, 2026
Spain – Catenary's construction works – Ejecución de las obras del proyecto constructivo para la electrificación de la línea Zaragoza – Teruel – Sagunto, tramo Teruel – Sagunto. Línea aérea de contacto.
Administrador de Infraestructuras FerroviariasSpainCatenary's construction worksDeadline in 31 daysPublished on Nov 19, 2026
Spain – Construction work for school buildings – Ejecución de las obras de ampliación y reforma del Institut Escola 1L en la Escola de Castellterçol. Clave: SAH-20224
Infraestructures de la Generalitat de Catalunya, SAUSpainConstruction work for school buildingsDeadline in 48 daysPublished on Nov 19, 2026