Skip to content
Back to search

France – Urban furniture – Fourniture et pose de mobilier urbain sur le site propre du TVM

RATP EXPERTISESFrancePublished on Jun 24, 2026
No deadline given

Description

This contract notice, launched by RATP Expertises on behalf of RATP CAP IDF, aims to establish a single-award, multi-lot contract for the supply and installation of new urban furniture on the dedicated site of the TVM for the subsidiary RATP CAP POMPADOUR. The contract takes the form of a multi-lot contract concluded for a firm period of 36 months from the date of signature. The contract is concluded with a minimum amount corresponding to the firm lot and with a maximum amount corresponding to the firm lot as well as the optional lots described below and in the consultation documents. The scope of the renewal of the furniture at the stops of the line includes, in particular: In the firm lot: - The renewal of the 118 bus shelters on the TVM line. - The removal of the 8 shelters (2x4) at the Carrefour Pompadour and Carrefour de la Résistance stations. - The removal of the existing bins and the renewal of 84 double waste receptacles - The integration into the new shelters of a support adapted to the attachment of the passenger information terminal already in place in the existing shelters - The installed furniture will not be equipped with advertising. In the optional lot: - Optional Lot 1: The supply and installation of 38 shelters on line 393 in the same model as line TVM. This lot will require a study phase prior to supply and installation. The contractor will include the cost of this study phase in their offer. - Optional Lot 2: The application of new adhesive to the installed furniture and the enhancement of the TVM totems - Optional Lot 3: The adhesive signage of the 38 shelters of line 393. This consultation includes a Base Solution (SB) and an Obligatory Alternative Solution (SAO). The alternative solution concerns only the Firm Lot and Optional Lot No. 1. Bidders must submit a technical and financial offer for the SB and the SAO. Bidders who do not submit a complete offer (SB + SAO) will see their offer rejected in its entirety. The criteria for selecting candidates are set out in the Consultation Regulations (RC).

CPV codes

Urban furnitureInstallation of street furniture

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders