Skip to content
Back to search
This tender has expired.

France – Engineering works and construction works – RD n°590 - DECONSTRUCTION DU PONT A. BERTRAND ET RECONSTRUCTION D'UN NOUVEL OUVRAGE - COMMUNE DE LANGEAC - LOT n°1 DECONSTRUCTION DU PONT A. BERTRAND

Département de la Haute-LoireFrancePublished on Sep 23, 2026
Deadline passed

Description

The services are priced per unit. This tender is composed of two lots launched at different stages. LOT 1: Demolition of the Pont A Bertrand. This involves the demolition of the bridge over the Allier. This structure is a reinforced concrete bridge with two arch spans and a central pier on the riverbank on the right bank. This structure was built in 1929. Due to its age and pathologies, it must be demolished for the subsequent reconstruction of a new structure. This reconstruction phase is not included in this dossier. The contractor carries out the services in compliance with the environmental requirements defined in the contract. It implements all necessary measures to limit the impacts of the site on the environment, particularly in terms of waste management, reduction of nuisances, prevention of pollution and use of materials with low environmental impact. Non-compliance with these obligations may result in the application of contractual penalties. Environmental Compliance Notice (NRE): - The clause defines the environmental obligations of the contractor and its subcontractors, applicable from the preparation to the reception of the works, in accordance with the Environmental Compliance Notice (NRE). - The candidate must provide an Organisational Scheme of the Environmental Compliance Plan (SOPRE) with its application, then an Environmental Compliance Plan (PRE) before the start of the works, specifying the organisation, the measures for controlling impacts, waste management, the modalities of control and reporting. - The PRE is subject to validation by the project owner and must be updated according to the progress of the site. - The company undertakes to strictly comply with all environmental prescriptions, in particular the protection of natural environments, the management of nuisances (noise, dust, water), the cleanliness of the site, and the regulatory management of waste with traceability. - An environmental manager will be responsible for ensuring compliance with regulatory obligations by all parties involved and will ensure that the environmental prescriptions are applied with regard to environmental protection on the site. - The project owner carries out regular checks, with the possibility of stop points for critical phases, and penalties may be applied in case of non-compliance.

CPV codes

Engineering works and construction worksDemolition, site preparation and clearance workDemolition work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders