Skip to content
Back to search

Poland – Construction work – Zagospodarowanie wód opadowych na terenie Parku Piastowskiego wraz z przebudową infrastruktury technicznej w ramach zadania: Wody opadowe – etap II

Miasto Zielona Góra - Urząd Miasta Zielona GóraPolandPublished on Nov 05, 2026
12 days left

Description

1) dismantling of existing hardened surfaces

2) repair of existing hardened surfaces

3) repair of ground-level steps

4) construction of new park path surfacing

5) installation of power, lighting, and monitoring systems

6) installation of road barriers

7) installation of a self-service toilet with a tank

8) installation of small architectural objects

9) construction of a rainwater drainage system

10) maintenance of existing vegetation

11) construction of plantings and rain gardens

2. A detailed description of the subject of the contract is contained in Annex I.2 to the SWZ and in the documents referred to in point 3.4 of the SWZ.

3. The subject of the contract shall be carried out in accordance with the project documentation and Technical Specifications for the Execution and Acceptance of Works contained in Annex I.4 to the SWZ.

4. The investment is co-financed by the European Funds for Infrastructure, Climate and Environment 2021-2027. Priority: FENX.01, Action: FENX.01.02 Adaptation of urban areas to climate change. Due to technical limitations, the remaining part of the information is in the tender documents (SWZ).

CPV codes

Construction workSite-development workBuilding installation workElectrical installation workConstruction work for pipelines, communication and power linesAncillary works for pipelines and cablesInstallation of road lighting equipment

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders