Poland – Civil engineering support services – IDEA TARNÓW – „Uregulowanie stosunków wodnych na terenie miasta Tarnowa z uwzględnieniem retencji wód opadowych wraz z inwentaryzacją cieków wodnych i ich utrzymaniem” – utrzymanie cieków wodnych, Część I – konserwacja cieków wodnych
Description
The order has been divided into 2 parts: 1) Part 1 of the order – „Watercourses I”, covering the following watercourses: - Bródka Stream – from km 0+000 to 1+260, - Lotniczy Ditch – from km 0+000 to 1+420, - „k/Pastwiska” Ditch – from km 0+000 to 0+489, - „Od Strusinki” Ditch – from km 0+000 to 0+790. The scope of the conservation works includes, in particular, the following works: a) mowing of watercourse banks, b) mowing a strip of min. 1 m wide along the upper edges of both banks, c) removal or mulching of mowed vegetation, d) desilting the bed and banks of watercourses with the planting or disposal of silt, e) desilting culverts, f) removing obstructions from the bed of watercourses, g) cutting back overgrowth and self-seeded plants from the watercourse channel, h) removal, clearing of litter and waste with disposal, i) minor repairs to the existing bed and bank reinforcement on the Bródka Stream and Lotniczy Ditch. 2) Part 2 of the order – „Watercourses II”, covering the following watercourses: - „D” Ditch – from km 0+000 to 0+730, - Jaracza Ditch – from km 0+000 to 1+260, - Bagienko Ditch – from km 0+000 to 2+100, - „Od Nowego Cmentarza” Ditch – from km 0+000 to 0+213. The scope of the conservation works includes, in particular, the following works: a) mowing of watercourse banks, b) mowing a strip of min. 1 m wide along the upper edges of both banks, c) removal or mulching of mowed vegetation, d) desilting the bed and banks of watercourses with the planting or disposal of silt, e) profiling banks, f) desilting culverts, g) removing obstructions from the bed of watercourses, h) cutting back overgrowth and self-seeded plants from the watercourse channel, i) removal, clearing of litter and waste with disposal, j) minor repairs to the existing bed and bank reinforcement on all ditches. The detailed description of the subject of the order includes work descriptions and quantities, constituting Annex 1 to the SWZ. The quality requirements related to the conservation of watercourses are contained in Annexes numbered 1 to the Draft Contract Terms, constituting Annexes 10a and 10b to the SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Architectural, construction, engineering and inspection services – Wykonanie aktualizacji dokumentacji projektowej termomodernizacji budynku Szkoły Podstawowej nr 27 przy ul. Sielskiej 34 w Bydgoszczy.
Miasto BydgoszczPolandArchitectural, construction, engineering and inspection servicesArchitectural design servicesArchitectural, engineering and surveying servicesDeadline in 29 daysPublished on Sep 15, 2026
Poland – Supervision of building work – Pełnienie nadzoru inwestorskiego nad realizacją robót budowlanych w ramach zadania inwestycyjnego pn. „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Lubaczowie przy ul. Jana III Sobieskiego 6”.
Izba Administracji Skarbowej w RzeszowiePolandSupervision of building workConstruction management servicesConstruction supervision servicesDeadline in 8 daysPublished on Sep 15, 2026
Poland – Supervision of project and documentation – Kontrola i monitoring realizacji prac związanych z utworzeniem oraz modernizacją cyfrowych baz danych BDOT500 oraz GESUT dla potrzeb realizacji projektu „e-Geodezja II - etap III
Powiat KraśnickiPolandSupervision of project and documentationData analysis servicesTechnical inspection and testing servicesDeadline in 35 daysPublished on Sep 15, 2026
Poland – Architectural design services – Konkurs studialno-realizacyjny na koncepcję "Gliwickiego Kwartału Kultury" w Gliwicach
Miasto GliwicePolandArchitectural design servicesEngineering design services for the construction of civil engineering worksLandscape architectural servicesNo deadline givenPublished on Sep 15, 2026