Skip to content
Back to search

Germany – Engineering services – Sanierung und Erweiterung des 3.+ 4. BA an der Klinik Eichstätt – Leistungen der Technischen Ausrüstung, Anlagengruppen 7 hier Medizintechnik gemäß §§ 53 ff. HOAI LPH 1-3+5-9

Kliniken im Naturpark Altmühltal AdöRGermanyPublished on Jul 02, 2026
No deadline given

Description

The District Office of Eichstätt intends to renovate the House of the Clinics in the Altmühltal Nature Park in Eichstätt in the 3rd and 4th construction phases. The Clinics in the Altmühltal Nature Park GmbH comprises two hospitals for basic and standard care at the locations of Kösching and Eichstätt. In the disciplines of Internal Medicine, Surgery, Orthopedics, Gynecology, Urology, Ophthalmology, and Ear, Nose, and Throat Medicine, approximately 45,000 patients are treated annually at both locations. In the meantime, the medical and nursing needs in the region have changed significantly. The operator is therefore required to adapt the structures and medical services to the challenges of current developments. Fundamental structural adaptations are necessary with regard to today's economic and functional requirements. The Eichstätt Clinic is undergoing a continuous general renovation with several construction phases, currently in the second construction phase. The existing structure is characterized by structural limitations and a reduced bed capacity, while at the same time an increasing supply demand is forecast due to performance shifts and demographic development. The goal is to expand to a total of 172 beds and to functionally reorganize central areas. The third construction phase represents the decisive development step and focuses on the targeted functional and spatial expansion of the clinic location. The core measure is the creation of additional nursing capacities through expansion additions to structurally implement the planned bed increase. A particular focus is on the implementation of an independent geriatric unit and further ward areas that meet future medical requirements. In addition, the Central Elective Admission (ZEA) will be realized in the 3rd construction phase, which serves as a structured and efficient point of contact for elective patients and bundles central processes. In addition, service and supply areas, especially for staff and visitors, will be reorganized and expanded. To ensure the ongoing clinic operation during the construction phase, a relief building will be erected in advance, which temporarily takes over nursing capacities and functional rooms and is perspectively permanently integrated for outpatient and supplementary uses. The fourth construction phase primarily involves the reorganization of central functional areas in the entrance and outpatient area, particularly with the main entrance, cafeteria, hospital management, as well as service, social, and treatment areas. In addition, BA 4 includes essential medical structures such as central admission, medical service, endoscopy, and supportive treatment, which are functionally combined and expanded. Overall, BA 4 thus serves to strengthen the central patient areas and the organizational core functions of the clinic operation while simultaneously reorganizing the space. The total costs of the overall project BA3+4 (KG 200-600) are estimated at approximately 45.0 million € gross and are divided as follows: - KG 200 0.25 million € - KG 300 27.7 million € - KG 400 15.5 million € - KG 500 0.60 million € - KG 600 1.03 million € The following areas are planned: 3rd BA 2,988.50 m² NUF 4th BA 2,920.50 m² NUF The project's timeline milestones are: - Start of performance: Oct 2026 - Application for pre-determination: 1st quarter 2027 - Start of construction: 1st quarter 2030 - Completion: BA 3 - 3rd quarter 2033 BA 4 - 3rd quarter 2036 Planning services are to begin immediately upon assignment. It is intended to award the following services (step-by-step + construction phase-wise) with this tender: Services of Technical Equipment, Plant Groups 7 here Medical Technology according to §§ 53 ff. HOAI LPH 1-3+5-9 The services will be awarded step-by-step and construction phase-wise. Initially, in the 1st awarding stage BA 3, the performance phase 1+2 according to HOAI will be awarded. The performance phases 3+5-9 will be called up step-by-step and construction phase-wise. There is no legal entitlement to the overall award.

CPV codes

Engineering services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders