Romania – Structures construction work – Execuție lucrări de infrastructură portuară prevăzute prin proiectul “Modernizare platforme portuare, modernizarea liniilor de cale ferata din incinta Romcim, instalare cantar CF, realizarea a doua pasaje la nivel cu calea ferata, construirea unui racord CF nou din linia 2 dana 67, modernizare si extindere cale de rulare pod incarcator fila dinspre uscat
Description
Execution of port infrastructure works provided for by the project “Modernisation of port platforms, modernisation of railway lines within Romcim, installation of CF weighing station, construction of a second level crossing with the railway, construction of a new CF connection from line 2 to 67, modernisation and extension of the rollerway of the loading dock towards the land” The contract duration is 78 months, of which 18 months is the execution period of the works, and a minimum of 60 months guarantee, for the works executed regarding line 67, and a minimum of 36 months, for the guarantee of works, other than those mentioned above, after their completion. We note that at present the project is approved by the Management Authority – AM PT, with the financing contract being signed. Accordingly, according to art. 21 para. (1) of H.G. nr. 395/2016, “The contracting authority may initiate the application of the award procedure only after the award documentation and supporting documents have been drawn up and approved”. The maximum period for which the suspensive clause operates is 12 months from the date of transmission of the communication regarding the result of the procedure, so that, in the event that the condition of signing the financing contract is not fulfilled, or the contracting authority does not identify other funds from which to ensure the financing of the investment, the award procedure will be automatically cancelled. The deadline by which any interested economic operator has the right to request clarifications or additional information regarding the award documentation is 20 days before the deadline for submission of tenders. The contracting authority will respond only once, to all requests for clarification, on the 11th day before the deadline for submission of tenders (see Art. 161, para. (1) of Law 98.2016).
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Construction work for highways, roads – Proiectare si executie „Nod Rutier Pantelimon (A0 - km 48) sectorul A0 Nord”
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.RomaniaConstruction work for highways, roadsRoad bridge construction workGrade-separated junction construction workDeadline in 38 daysPublished on Sep 03, 2026
Romania – Construction, foundation and surface works for highways, roads – Proiectare, asistență tehnică din partea proiectantului și execuție lucrări pentru obiectivul de investiţii ,Modernizare DJ 653, lim. jud. Olt – Crângeni, km 66+120 – 73+845"
JUDETUL TELEORMANRomaniaConstruction, foundation and surface works for highways, roadsEngineering-design services for traffic installationsTechnical assistance servicesDeadline in 12 daysPublished on Sep 03, 2026
Romania – Gas supply mains construction work – Proiectare si executie lucrari pentru OBIECTIVUL DE INVESTIȚII: ÎNFIINȚARE RETEA INTELIGENTA DE DISTRIBUTIE GAZE NATURALE IN UAT-URILE PARTENERE ( UAT BOTENI, UAT HARTIESTI, UAT VULTURENI SI UAT DAVIDESTI)
ASOCIAȚIA DE DEZVOLTARE INTERCOMUNITARĂ GAZE BOTENI-HÂRTIEȘTI-VULTUREȘTI-DAVIDEȘTIRomaniaGas supply mains construction workConstruction workGas-fitting installation workDeadline in 14 daysPublished on Sep 03, 2026
Romania – Road bridge construction work – Proiectare si Executie Lucrări pentru obiectivul de investiție “CONSTRUIRE PASAJ RUTIER CARTIER TRACTORUL-BDUL.GRIVIȚEI ȘI LEGĂTURI INTRE I.C. BRĂTIANU ȘI BDUL. GRIVIȚEI”
MUNICIPIUL BRASOVRomaniaRoad bridge construction workEngineering design services for the construction of civil engineering worksDeadline in 17 daysPublished on Sep 03, 2026