Skip to content
Back to search

Poland – Construction work – B/20/2026 Przebudowa budynku Biblioteki Głównej i Instytutu Historii Uniwersytetu Opolskiego.

Uniwersytet OpolskiPolandPublished on Nov 18, 2026
12 days left

Description

The subject of the order is: The reconstruction of the Main Library and the Institute of History building of the University of Opole. 1. The subject of the order is described in Annex 1A to the SWZ (file folder). 2.1 The ordering party allows a local inspection of the building of the Library to familiarise with the place of execution of the subject of the order. 2.2 The said inspection is not mandatory and the provisions of Article 226(1)(18) of the Act shall not apply. 2.3 Detailed information regarding the local inspection is provided in Section I, point 3.2.7 of SWZ II. Additional information 1. The ordering party does not allow the submission of partial offers. 2. The ordering party does not allow the submission of alternative offers. 3. Pursuant to Article 95 of the Act, the ordering party requires the Contractor or Subcontractor to employ, under an employment contract (within the meaning of the Act of 26 June 1974 – Labour Code (i.e. Journal of Laws of 2025, item 277 as amended)), persons performing the activities indicated below related to the implementation of the order, the performance of which consists in performing work. The type of activities related to the implementation of the order, which are subject to the requirement of employment under an employment contract by the Contractor or Subcontractor of persons performing activities during the implementation of the order: general building works. The method of verification by the ordering party of the employment of these persons and the powers of the ordering party in the scope of control of compliance by the Contractor with the requirements related to the employment of these persons as well as the sanctions for non-compliance with these requirements have been determined by the ordering party in the draft contract constituting Annex 3 to the SWZ. 4. The ordering party does not envisage the possibility of granting orders, as referred to in Article 214(1)(7) and (8) of the Public Procurement Act. 5. Requirements regarding the security of proper performance of the contract 5.1. The ordering party will require the contractor to provide security for the proper performance of the contract in the amount of 5% of the total price given in the offer, which will be used to cover claims arising from the non-performance or improper performance of the contract. 5.2. The contractor will propose the form of providing security: in cash, bank guarantees or cooperative savings and credit bank guarantees, with the proviso that the obligation of the bank is always a monetary obligation, bank guarantees, insurance guarantees, guarantees issued by entities referred to in Article 6b(5)(2) of the Act of 9 November 2000 on the establishment of the Polish Agency for Enterprise Development. Guarantees must be unconditional. 5.3. Security may be provided in one or more forms. 5.4. Seventy [70] percent of the security will be returned within 30 days from the date of completion of the order and its recognition by the ordering party as properly performed, and thirty [30] percent will be returned 15 days after the expiry of the warranty period for defects or guarantee. 5.5. The security must be provided no later than on the date of conclusion of the contract. (additional information on security is provided in point 21 of the SWZ)

CPV codes

Construction workSite preparation workBuilding demolition and wrecking work and earthmoving workDemolition workWorks for complete or part construction and civil engineering workBuilding construction workRoadworksMasonry and bricklaying workBuilding installation workElectrical installation workElectrical wiring workElectrical fitting workAlarm system and antenna installation workFire-alarm system installation workBurglar-alarm system installation workInstallation of cable infrastructureInstallation of computer cablingElectrical installation work of heating and other electrical building-equipmentElectrical engineering installation worksElectricity supply installationsLow-voltage installation workInsulation workPlumbing and sanitary worksInstallation work of cooling equipmentFire-prevention installation worksBuilding completion workPlastering workJoinery workInstallation of partitioningFloor and wall covering workFloor laying and covering workPainting workNetwork cablingNetwork hubsNetwork componentsNetwork infrastructureVideo-surveillance systemAlarm systemsData-communications equipment

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders