Germany – Transformers – Lieferung & Montage von 110/20 kV Transformatoren 50 / 63 MVA
Description
The AG is a regional network operator for electricity, heat, water and internet services. Stadtwerke Steinburg plan to build a new 110/20kV substation, designated UW Itzehoe-Nordwest, on a greenfield site. The 110 kV installation will be designed as an outdoor switchgear with a 2-busbar system and 2 transformers from 110 kV to 20 kV. The feed-in will be via 2 switchgear panels on the 110 kV side from the nearby 110 kV substation Itzehoe-West using 2.500/95 mm² single-core aluminium cables. This cable route extends approximately 2.3 km from the UW Itzehoe-West to the UW Itzehoe-Nordwest with 2.500/95 mm² single-core aluminium cables.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Electricity distribution and control apparatus – UW Trossingen - Sekundärtechnikschränke
TransnetBW GmbHGermanyElectricity distribution and control apparatusElectrical apparatus for switching or protecting electrical circuitsParts of electricity distribution or control apparatusNo deadline givenPublished on Sep 01, 2026
Germany – Transformers – 450 MVA Transformatoren
enercity Netz GmbHGermanyTransformersInstallation services of transformersControl panelsNo deadline givenPublished on Sep 01, 2026
Germany – Rechargers – Rahmenvertrag über die Belieferung mit Ladeeinrichtungen
Vitos gemeinnützige GmbHGermanyRechargersDeadline in 30 daysPublished on Sep 01, 2026
Germany – High-voltage cable – HV-Kabel TBW/EnBW
EnBW Energie Baden-Württemberg AGGermanyHigh-voltage cableNo deadline givenPublished on Aug 31, 2026