Skip to content
Back to search
This tender has expired.

Romania – Non-hazardous refuse and waste treatment and disposal services – PROIECTARE-EXECUŢIE-OPERARE STAŢIE DE TRATARE MECANO-BIOLOGICĂ CU DIGESTIE ANAEROBĂ ȘI RECUPERARE DE ENERGIE ȘI STAȚIE DE TRANSFER GALAŢI

JUDETUL GALATIRomaniaPublished on Sep 14, 2026
Deadline passed

Description

This public procurement is carried out jointly by an association of contracting authorities, pursuant to Article 44 of Law 98/2016. The COUNTY OF GALAŢI (Galaţi County Council) is the mandated contracting authority to organise this award procedure, as the association leader. Any of the beneficiary/contracting authorities of the public procurement contract will be represented by the Contracting Authority. The contracting authorities that associate for the implementation of this joint procurement are: - County of Galaţi (Galaţi County Council); - ECOSERV Galaţi Intercommunal Development Association. The contract includes the design, execution and operation of the Galaţi transfer station and the mechanical-biological treatment station with anaerobic digestion, respectively: a) Preparation of Technical Design in accordance with national legislation, including all necessary documents (memories, drawings, calculations, etc.) and any documentation necessary for obtaining the building permit; b) Preparation of documentation necessary for obtaining the authorizations and approvals required for execution; c) Construction works; d) Supply and installation of machinery and technological equipment; e) Testing and commissioning; f) Remedying any defects arising during the Warranty Period; g) Administration and operation of the transfer station and the mechanical-biological treatment station with anaerobic digestion. The Warranty Period is 36 months. The operation period of the facilities is 10 years. The contract defines 4 work sectors as follows: Sector 1 - Transfer Station Sector 2 - Mechanical Treatment Station Sector 3 - Anaerobic Digestion Station Sector 4 - Composting of Digestate - Design Phase (6 months): preparation of the Technical Design in accordance with national legislation, including all necessary documents. - Execution Phase (32 months): construction works, supply and installation of machinery and technological equipment, testing and commissioning. - Operation Phase (10 years): administration and operation of the transfer station and the mechanical-biological treatment station with energy recovery. The rates are presented in the Justification Study, and the summary of the maximum ceilings for the rates related to the first year of operation are presented below: - Maximum rate year 1, for the transfer of paper, metal, plastic and glass waste: 175.08 lei/tonne ex VAT - Maximum rate year 1, for the transfer of residual waste: 187.73 lei/tonne ex VAT - Maximum rate year 1, mechanical-biological treatment: 556.28 lei/tonne ex VAT - Maximum rate year 1, anaerobic digestion: 520.51 lei/tonne ex VAT. Clarifications may be requested within a period not exceeding 20 days until the deadline set for the submission of tenders. The deadline by which the contracting authority will respond clearly and fully to all requests will be: in the 11th day before the deadline for the submission of tenders.

CPV codes

Non-hazardous refuse and waste treatment and disposal servicesWaste-treatment plant construction workWaste transfer stationEngineering design services for the construction of civil engineering works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders