Skip to content
Back to search

Germany – Engineering services – Neubau Campus Zentralklinikum Magdeburg – NCZMD – Tragwerksplanung

IPS Immobilien- und Projektmanagament Gesellschaft Sachsen-Anhalt mbHGermanyPublished on Apr 21, 2026
No deadline given

Description

New Construction Campus Central Hospital Magdeburg – NCZMD – Structural Design

The University Hospital Magdeburg A.ö.R. (UKMD) together with the Faculty of Medicine (FME) of the Otto-von-Guericke University (OvGU) form the University Medicine Magdeburg (UMMD). This merger unites research, teaching (FME) and patient care (UKMD). With approximately 1,100 beds, the University Medicine is the largest hospital in the city of Magdeburg and also the largest medical facility in northern Saxony-Anhalt. The structural clinic is characterized in particular by decentralization. The main campus with a total area of approximately 300,000 sqm is located at Leipziger Straße 44. The University Clinic for Obstetrics, Gynecology and Reproductive Medicine as well as the inpatient area of the University Eye Clinic are located at the external site at Gerhart-Hauptmann-Straße 35 (distance as the crow flies approx. 3 km). The main campus is characterized by a pavilion structure. Clinics, outpatient departments, laboratories, logistics, as well as research and teaching are decentralized on the site. In total, there are 26 clinics and 19 institutes as well as other independent or affiliated departments distributed across both sites. In addition to research and teaching, the University Medicine Magdeburg offers the entire spectrum of a multi-professional and highly specialized medical maximum care. The entire University Medicine employs approximately 4,300 employees in research, teaching, patient care and administration. In addition, a total of approximately 1,500 students are enrolled at the Faculty of Medicine and others in the Master's program in Immunology. The current structural structure of the UKMD is characterized by a dislocated building structure, outdated technical infrastructure, long distances and outdated functional structures. There is an urgent need for action to prepare the UMMD for the future challenges of university medicine and to solve pressing structural problems. The new construction of the Central Hospital is intended to bring together the previously dislocated clinics and functional units of the University Hospital in a centralized and structurally-functional optimized structure and thus resolve a situation that is no longer up-to-date. Taking into account the existing areas in buildings 60a and 60b, a large part of the clinical areas and a predominant proportion of the total usable areas of the UKMD will be located in the Central Hospital complex in the future. The new construction of the "New Campus Central Hospital" is the largest construction project in the state of Saxony-Anhalt and is critical to the future viability of the site at Leipziger Straße. The planning and construction implementation is divided into several individual, interdependent sub-projects. Due to the complexity of the construction measures and the heterogeneous nature of the projects, this is necessary both in terms of content and organization. The current budget approved for the overall project is approximately 1 billion €, half of which is allocated to the new construction of the Central Hospital (construction sections 1 and 2) alone. The focus of the building function should be on the harmony of medically up-to-date and future-proof processes, efficient operational structures and economical solutions. In addition, the following requirements must be taken into account: - It must be ensured that modern, safe, competitive and legally compliant healthcare is possible at the site of the University Medicine Magdeburg and that the current safety risks are minimized. - The planning must be future-proof and innovative. - The highest possible level of automation must be taken into account. - The planning of the Central Hospital must be carried out in such a way that a highly flexible building is created. This flexibility should enable re-use by other medical specialties; if necessary, also as a result of a changed medical strategy. The most complex and medically important project is the new construction of the new central building for healthcare, which, according to the specifications of the existing master plan, directly adjoins the existing buildings House 60a and House 60b and is intended to form a unit with them. The new central building is a highly complex project in planning, execution and operation, but also in the preparation of the procedure, with multifactor dependencies and a large number of users. It is also challenging to integrate the new building into the existing structures, taking into account existing, partly listed, existing buildings. Due to the complex requirements for the new construction of the Central Hospital, the client, IPS GmbH, has decided to implement this part of the overall project as an Integrated Project Delivery (IPA). In total, the following IPA partners will be commissioned for planning and execution: Key Trade 1: ELT Execution – Technical Equipment (Electrical Systems) Key Trade 2: HLS Execution – Technical Equipment (excluding electrical systems) Key Trade 3: Specialist Planning Services Technical Equipment Key Trade 4: Extended Architectural Services Key Trade 5: MSR/GLT Planning and Execution Key Trade 6: Medical Technology Planning and Execution (LOT 473), turnkey with LOT 300 and 400 Key Trade 7: Specialist Planning Services Structural Design Key Trade 8: Execution Services Fit-Out Key Trade 9: Execution Services Extended Rough Construction/Special Civil Engineering

CPV codes

Engineering servicesEngineering design servicesLoad-bearing structure design servicesVerification of load-bearing structure design servicesArchitectural and related services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders