Germany – Drilling equipment – Geothermie Gräfelfing GmbH&Co.KG - Liner Hanger
Description
Geothermie Gräfelfing GmbH & Co. KG (GGK) intends to construct a deep geothermal plant for municipal heat supply. The Malm reservoir is to be developed for heat supply. As part of this plan, a deep geothermal plant and an associated district heating network with redundancy and peak heating plant are to be planned, constructed and operated. In this context, the drilling of four geothermal deep wells (two doublets, each with one production well and one injection well) from a common drilling site and the construction of a technical building are planned. One of the two doublets is to serve as an independent redundancy and peak load supply to ensure 100% CO2-free heat supply. The planned site is located at "Neurieder Weg 1", municipality: 8673 Gräfelfing, parcel: 180/0.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Workshop equipment – Modernisierung der Ausstattung im Bildungszentrum Rosenheim IZBN 71102 - Teil 1
Handwerkskammer für München und OberbayernGermanyWorkshop equipmentDeadline in 16 daysPublished on Sep 08, 2026
Germany – Workshop equipment – Beschaffung von Dacharbeitsplätzen (Hauptwerkstatt)
KVG Kieler Verkehrsgesellschaft mbHGermanyWorkshop equipmentNo deadline givenPublished on Sep 08, 2026
Germany – Workshop equipment – Herstellung und Lieferung einer 5-Achs Simultan Fräsmaschine für die Wissenschaftl. Werkstatt des Alfred-Wegener-Instituts in Bremerhaven
Alfred-Wegener-Institut Helmholtz-Zentrum für Polar- und MeeresforschungGermanyWorkshop equipmentDeadline in 26 daysPublished on Sep 06, 2026
Germany – Front-end shovel loaders with backhoe – Sechsundzwanzig (26) neue Baggerlader inkl. optionaler Aufstockung um zwölf (12) weitere neue Baggerlader
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHGermanyFront-end shovel loaders with backhoeMechanical shovels, excavators and shovel loaders, and mining machineryMechanical shovel loadersDeadline in 13 daysPublished on Sep 06, 2026