Luxembourg – Building installation work – CHL NBC VE 4754 Pathologie mit Kühlzellen
Description
The Centre Hospitalier de Luxembourg intends to procure certain pathology equipment as part of the new construction project, in accordance with the procurement procedure "Book II Open Procedure (Loi, Art. 63 and 65)". The tender includes the supply and installation of:
- 1 mortuary cooler with individual compartments for 21 deceased (including 3 places for obese)
- 1 mortuary cooler for 1 radioactive deceased
- 18 standard-size mortuary trays
- 3 obese-size mortuary trays
- 1 standard-size mortuary tray for radioactive deceased
- 1 mobile wash and autopsy table with docking station interface
- 1 docking column for mobile autopsy table
- 1 mobile autopsy table for corneal removal
- 1 coffin trolley
- 3 hydraulic mortuary tray trolleys for standard size and obese deceased
- 1 mobile catafalque frame with cooling, including drape and tray
- 1 freezer for body parts with temperature monitoring
- 2 floor lamps (electric candles)
The supply and installation of the components should be carried out separately according to the following priority scheme: installation of substructures, installation of mortuary coolers, delivery of accessories immediately before commissioning (theft prevention). 1 main and 1 rectification date are included in the offer price, with the partial services to be scheduled according to the timetable and coordinated with the local construction management/specialist construction management. The statutory limitation period for warranty claims begins with the acceptance of the service. The day of acceptance (complete installation including rectification of defects) is the start of the warranty period. The following services are to be offered and calculated in addition to the device-related services:
- The contractor (AN) must cooperate in the collision check by the coordinating architect (4Bund). The installation plans are to be adapted if necessary.
- For organizational meetings - also in sections and sections - the AN must provide a technically and operationally familiar, expert employee with the system in all parts.
- Further services according to the additional technical remarks of the medical technology.
Suitability criteria according to general and special contract conditions, point 1.10 / point 2.10
The following dates are relevant for the supply and installation of the equipment:
Possible start of installation: 24.09.2027
Latest completion of installations: 29.03.2029 (interior finishing + technology according to Generalablaufplan_V5)
Taking into account the start date, an installation schedule is to be submitted and, if necessary, adapted to the specifications of the architect (4Bund). The times required for each device for introduction and installation are to be deposited.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Luxembourg – Floor-screed works – 2499 - Rilspert IV - Construction d'une résidence 18, rue des érables L-8072 Bertrange – Travaux de chape, carrelage.
Fonds du LogementLuxembourgFloor-screed worksTiling workFloor-tiling workDeadline in 33 daysPublished on Oct 07, 2026
Luxembourg – Installation of metal joinery except doors and windows – Nouvelle Maison Communale de Kaërjeng
Administration Communale de KäerjengLuxembourgInstallation of metal joinery except doors and windowsInstallation of metal structuresAssembly of metal structuresDeadline in 32 daysPublished on Oct 07, 2026
Luxembourg – Structural shell work – VdL: Travaux de terrassement, gros-oeuvre, toiture plate et menuiserie extérieure dans le cadre du projet de construction d'un bâtiment scolaire sis 32, rue Marche à Luxembourg-Beggen.
Administration communale de la Ville de LuxembourgLuxembourgStructural shell workDeadline in 46 daysPublished on Oct 07, 2026
Luxembourg – Lift installation work – Réaménagement du centre de Leudelange - Bâtiment Um Wäschbuer (Phase 3) - Travaux d'ascenseur
Commune de LeudelangeLuxembourgLift installation workDeadline in 28 daysPublished on Oct 07, 2026