France – Sewerage work – Sécurisation du fonctionnement hydraulique de la station de pompage VL2 à Villeneuve Saint Georges
Description
The reliability of the interdepartmental pumping station VL2 located in Villeneuve Saint Georges, owned by the Syndicat Interdépartemental pour l'Assainissement de l'Agglomération Parisienne and operated by the Val de Marne Departmental Council (Direction des Services de l'Environnement et de l'Assainissement). The VL2 pumping station was built in 1991 to supply the STEP of Valenton (Seine amont - SAM) with effluents collected in the Val de Marne and to relieve Seine aval. The present project aims to implement the results of the hydraulic reliability study and the AMDEC (Failure Modes and Effects Analysis) carried out from 2016 to 2018 for all items noted as having unacceptable criticality of degree 1, namely: - Modification of pumping to ensure continuous compliance with the flow rates required by the STEP regardless of pump failure occurrences, - Securing the discharge tank, - Partitioning of the TGBT and transformers, - Modification of the screening system to evacuate the grinds, - Replacement of the inlet valves. The objectives are threefold: - On the one hand, to ensure the availability and backup of the VL2 pumping in line with the purification objectives of SAM (flow rate of 6m3/s) and thus reduce the routing to SESAME and Charenton - On the other hand, to make the equipment of the VL2 station more reliable, the analysis of the failure modes (AMDEC) of which has revealed unacceptable criticality, - Finally, to improve the quality of the effluent pumped to the Valenton plant by eliminating the screening rejects at the source (shared desire in the SIAAP area to reduce the silting of the pretreatment and thus improve the efficiency of the wastewater treatment plant).
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Construction work – Aménagement de stations d’autopartage et travaux de VRD associés
Île-de-France MobilitésFranceConstruction workDeadline in 24 daysPublished on Nov 19, 2026
France – Electrical wiring and fitting work – Accord-cadre pour la fourniture, l'installation, la mise en service et la maintenance des analyseurs de rejets atmosphériques pour les centrales thermiques EDF SEI de : - Saint Pierre 2 (SP2), St Pierre & Miquelon - Saint Barthélémy Tranche 2 (SBH), Antilles - Saint Martin (SXM) Tranche 3, Antilles - Pointe des Carrières (PK) (TAC 1, PJ1 et PJ2), Martinique
EDF SAFranceElectrical wiring and fitting workPollutants tracking and monitoring and rehabilitation servicesNo deadline givenPublished on Nov 19, 2026
France – Construction work for buildings relating to railway transport – Conception réalisation et maintenance de sites de maintenance et de remisage à Wissembourg et Lauterbourg dans le cadre du programme d'ouverture à la concurrence de la Région Grand Est
SPL Grand Est InfrastructuresFranceConstruction work for buildings relating to railway transportNo deadline givenPublished on Nov 19, 2026
France – Drilling and exploration work – Forages dirigés complexes
Enedis SAFranceDrilling and exploration workNo deadline givenPublished on Nov 19, 2026