France – Sewage work – Marché de conception-réalisation pour la réhabilitation et l'extension de la station d'épuration de Pierrefonds et du poste de refoulement de Balance.
Description
The contract concerns the rehabilitation and extension works of the Pierrefonds wastewater treatment plant, including:
- The creation of a 3000 m3 stormwater basin on the site of the Balance pumping station
- The rehabilitation of the Balance pumping station or construction of a new structure
- The laying of two Ø500 refoulement pipes and the removal/refurbishment of a degraded Ø500 cast iron pipe and a degraded PRVØ600 pipe
- The extension of the Pierrefonds wastewater treatment plant to 225 000 PE, including the deconstruction of non-reusable structures and the rehabilitation of retained structures
- The implementation of tertiary treatment
- The implementation of a recovery station for external materials
- The laying of a new sea outfall and the removal/refurbishment of the old outfall
- Operational assistance
As an optional tranche, the following is requested:
- The implementation of a sludge methanisation unit and cogeneration
- The implementation of a quaternary treatment to meet the requirements of the new DERU2
- The disinfection of treated waters
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026