Skip to content
Back to search
This tender has expired.

Germany – Construction work for buildings relating to health and social services, for crematoriums and public conveniences – Erweiterung und Sanierung Klinikum Altmühlfranken 1. BA (Unterbauabschnitt 1a)

Kommunalunternehmen Klinikum AltmühlfrankenGermanyPublished on Oct 07, 2026
Deadline passed

Description

In 2008, the Klinikum Altmühlfranken in Weißenburg was expanded to include a specialist medical centre. Now, due to its age and deficiencies in space and functionality, the hospital is to be comprehensively renovated and extended in two construction phases. This application for construction and equipment planning includes the first construction phase BA1 and its two sub-phases BA1A and BA1E.

BA1 – 1. Construction Phase

In the first construction phase, the existing functional wing will be replaced by a new building (BA1A) and subsequently renovated or converted for future use (BA1B). In addition, the existing entrance hall will be expanded and renovated (BA1E).

BA1A - New Building: The new building in the south-east of the site is planned as a compact structure with an ideal floor plan organisation and direct access to the main entrance. The new building will house all the highly equipped core functions of the hospital: - Basement: AEMP, laboratory, changing rooms, archive, laundry exchange, engineering - Ground Floor: ZEA/ZNA with new patient admission and outpatient entrance, radiology, endoscopy, functional diagnostics, maternity - 1st Floor: Operating department with Same-Day Surgery, intensive care, on-call duty - 2nd Floor: Engineering

The floor plan provides a centrally located public access corridor running east-west, along which the individual functional areas and the vertical access with lift core are arranged. On the 1st floor, an atrium will also be created, which ensures the lighting of the corresponding departments. In this custom-designed new building, optimal hospital processes will be achieved and the primary functional deficiencies of the existing structure will be eliminated. The autonomous construction of the new functional wing BA1A will allow ongoing operations in the existing structure to continue uninterrupted.

BA1E - New Building/Renovation Entrance Hall: The new building and its connection to the existing structure will create a new entrance situation and thus a new forward-looking urban design for the hospital. To this end, the existing entrance hall will be expanded/straightened on the entrance level, thus creating a clear and unambiguous access. The entrance hall, located in the centre of the hospital, will be comprehensively renovated and will house general functions: - Ground Floor: Service facilities with reception/post office, pastoral and social services - Upper Floors: Access with waiting areas

During this renovation, a temporary main entrance can be provided from the north at the transition to the new building.

BA1B - Renovation of Existing Building, Outlook (not part of this BAP): After the core functions of the hospital have been moved to the new building BA1A, the original functional wing will be converted accordingly and the following functions will be located there: - Basement: Supply/disposal, storage, domestic and transport services, maintenance/repair, waste disposal, pharmacy, engineering - Ground Floor: Physical therapy, medical service, on-call duty, catering with visitor/employee cafeteria with outdoor area - 1st Floor: Medical service, administration - 2nd Floor: Chapel, engineering

As part of the comprehensive renovation, a courtyard will be created on the 1st floor as a major structural intervention to provide lighting for the adjacent functions. The entire renovation can be carried out in one go, only 4/7 of the existing catering in the 1st basement will initially remain and will be moved back and converted accordingly after completion of the new catering on the ground floor.

BA2 - 2. Construction Phase, Outlook (not part of this BAP)

In the second construction phase, nursing care will then be modernised at the Klinikum Altmühlfranken in Weißenburg. There are two possibilities for this: - Renovation and extension of the existing nursing homes - New nursing buildings next to the newly constructed functional wing BA1A, which allows for an ideal connection to new nursing buildings in terms of its positioning and floor plan layout.

CPV codes

Construction work for buildings relating to health and social services, for crematoriums and public conveniencesClinic construction workConstruction work for buildings relating to healthConstruction work for buildings relating to law and order or emergency services and for military buildings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders