Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Stadt Cottbus - VHVmöTw 204-2026 Entwicklung Gesamtschulstandort Joliot-Curie-Straße/Gartenstraße in Cottbus - Planung (HLS)

Stadtverwaltung CottbusGermanyPublished on Oct 06, 2026
No deadline given

Description

In accordance with the all-day entitlement, a close spatial-functional linkage between the buildings located on the site, including the use of shared spaces (e.g. auditorium, sports hall or school), is sought. As part of the preliminary investigation, the described location with its existing building parts and spatial conditions is to be examined in the initial planning phases, and a viable use concept for the entire site is to be developed in coordination with the user/client. Particular attention must also be paid to the examination of the sports hall as part of the preliminary investigation. The visibly dilapidated structural condition and inadequate spatial capacities may necessitate a replacement new build. It is assumed that a new two-court sports hall will likely replace the existing structure. The construction measure will take place at least partially while in use, as there are only limited alternative options available in the municipal area. The daycare center located in the building along Gartenstraße will have left the building at the start of realization, after the completion of a replacement new build elsewhere in the municipal area. Due to the fact of partial continued use, the construction work will be carried out in several construction/sectional stages. An appropriate concept for the construction process is to be planned and coordinated with the user, taking into account the necessary requirement for spatial capacities. The focus of the project is a future-proof site that is to be conceptually worked out and transferred into a structured and optimized realization phase via meaningfully formed construction/sectional stages. In line with the Federal Ministry of the Interior and Community's guide for sustainable building, aspects of economy, ecology, socio-cultural and functional quality, as well as technical quality and process quality, are also to be considered in this construction project (no certification required). The construction measure is to be carried out from an energy perspective, taking into account the conservation of natural resources, during the construction phase and during the period of use. Planning is scheduled to begin in the first quarter of 2027. Please refer to the description of services for exact details.

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders