Skip to content
Back to search

Germany – Heat-transfer station construction work – Brainergy Park Energie GmbH wg. Elektrische Energieversorgung (Los 6) Leittechnik (Los 7)

Brainergy Park Energie GmbHGermanyPublished on May 06, 2026
No deadline given

Description

On the site of the former transmission plant on the outskirts of Jülich and in the immediate vicinity of the FH Aachen campus, a science park and innovative business area with an area of approximately 52 ha is currently being created (hereinafter: "Brainergy Park Jülich"). The AG is tasked with supplying the properties in the Brainergy Park with heat, cold, and energy services. The AG plans to build an energy centre. The energy supply (heat/cold) of the Low-Exergy Network (LE Network) in the Brainergy Park is to be realized through reversible heat pumps, heat/cold storage, electric boilers, and waste heat processes. The LE Network is to be commissioned before the energy centre is completed. The provisional electrical energy supply in construction section 1 has already been awarded. The scope of work here includes the electrification of the transformer stations, the first 7 of a total of 11 heat pumps, and the provisional network pumps and pressure maintenance. The subject of this procurement procedure are services for the construction of the energy centre in the following lots: • Lot 6: Electrical Energy Supply • Lot 7: Control Technology

CPV codes

Heat-transfer station construction workLow-voltage installation workElectrical installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders