Skip to content
Back to search
This tender has expired.

Poland – Engineering design services for the construction of civil engineering works – Wykonanie kompletnej dokumentacji projektowej wraz z uzyskaniem wszystkich decyzji administracyjnych niezbędnych do przeprowadzania robót budowlanych realizowanych w Nadleśnictwie Kluczbork w ramach projektu MRN3

Skarb Państwa - Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo KluczborkPolandPublished on Jul 12, 2026
Deadline passed

Description

The order has not been divided into parts - the justification contains SWZ. As part of the project documentation, the Contractor is obligated to carry out: a Construction and Execution Project (serving, among other things, at the stage of preparing the tender documentation for the execution of construction works for the description of the subject of the order), consisting in accordance with the applicable regulations of: a) a Construction Project taking into account the specifics of the order, and in particular the natural-technical conditions, b) an Execution Project supplementing and detailing the Construction Project (to the extent and degree of accuracy necessary to carry out the construction works) serving as the basis for the preparation of the construction works, containing detailed drawings and profiles along with a detailed description of the construction-technological solutions, Geotechnical Surveys along with an opinion, serving to assess the geological-morphological conditions of the area and serving as the basis for determining the geotechnical conditions for the placement of construction objects, Hydrological Documentation serving as the basis for the measurement of hydrotechnical structures, Subject of Works with a calculation and compilation of the quantities of basic work units for each of the objects, Investment Cost Estimate prepared on the basis of the prepared subject of works with prices resulting from the prepared protocol of input data for costing at the stage of implementation of the project documentation, STWiORB containing collections of requirements necessary for determining the standard and quality of the execution of works in the scope of the method of execution of construction works, the properties of construction products, and the assessment of the correctness of their execution, The execution of the above-mentioned documentation also includes obtaining all opinions, agreements, permits, and administrative decisions resulting from the provisions of the law and the requirements for tasks co-financed from EU funds: a) Decision on the environmental conditions for the implementation of the project (together with opinions/decisions of PPIS and RDOŚ) or a decision suspending the proceedings b) Extract from MPZP c) Decision on the conditions of development and land management/Decision on the determination of the location of a public purpose or refusal to issue a decision, d) Decision on water law permit based on the prepared water law investigation report along with the attachment: Declaration of the body responsible for water management e) Decision determining the conditions for carrying out activities under Article 118 of the Nature Conservation Act, f) Notification of the commencement of works to RDOŚ g) Decision on building permit In the event that the competent authority issues a decision on the necessity of conducting an environmental impact assessment (EIA) and preparing an EIA report, the obligation to prepare it rests with the Contractor. The Contractor is obligated to prepare maps for project purposes taking into account the scope and specifics of the planned implementation, prepared by a surveyor possessing the appropriate authorisations, The project documentation should be prepared on the basis of the previously prepared hydrological documentation prepared by a person possessing hydrological qualifications or hydrological qualifications, For the preparation of the project documentation, it is necessary to carry out geotechnical documentation serving to assess the geological-morphological conditions of the area and serving as the basis for determining the geotechnical conditions for the placement of construction objects, prepared by a person possessing the appropriate qualifications. Design solutions in the working phase, adopted in the project documentation, must be absolutely submitted for agreement to the Purchaser. Agreements must be in written form. The Purchaser will make agreements within a period not exceeding 14 days from the date of receipt of the documentation in written form. The project documentation should also include: a) Calculations and balancing of earth masses as well as indications of the places of extraction, places of soil storage for development, and its transport, b) Solutions in the scope of temporary roads in case of the necessity of their execution. The project documentation should take into account all obligations resulting from the legal conditions in force on the day of its transfer to the Purchaser. The project documentation should be prepared and transferred to the Purchaser in 3 (three) paper copies and in 2 (two) copies (on two electronic media) in a non-editable version, with the exception of the cost estimate, subject of works, STWiORB, which should be prepared in 3 (three) paper copies and in 3 (three) electronic copies (subject and cost estimate also in editable version). The documentation should be prepared on the basis of the legal acts indicated in point 4.4.8. SWZ. Additional requirements for the implementation of the Subject of the Order are contained in the "Guide to the Implementation of the MRN3 Project". The area in which the project is planned to be implemented is presented by overview maps constituting Annex No. 11 to SWZ. Part of the area in which the implementation of the investment is planned is located within the landscape park named "Stobrawski Park Krajobrazowy". The Contractor may entrust the implementation of part of the elements of the subject of the order to subcontractors. In the event of the intention to execute the subject of the order with the participation of subcontractors, the Contractor is obligated to indicate in its offer: the part of the order (subject ranges) the execution of which it intends to entrust to subcontractors and the Contractor to provide the subcontractors in the offer form (if they are already known). In the absence of indication in the Offer of subcontracting, the Contractor will only be able to introduce a subcontractor on the terms specified in the Contract. The technical assumptions for design are contained in Annex No. 10 to SWZ.

CPV codes

Engineering design services for the construction of civil engineering worksProject and design preparation, estimation of costsSupervision of project and documentation

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders