Poland – Public-service buses – „Zakup zeroemisyjnych autobusów oraz systemu ładowania na potrzeby transportu miejskiego w Świnoujściu”
Description
The subject of the contract is: 1) delivery of 4 new factory-made MIDI-class, zero-emission, low-noise, low-floor electric buses; 2) charging infrastructure – including 1 mobile charger – 2 X 60 kW = 120 kW. 2. The detailed description of the subject of the contract and the technical specifications are included in Annex No. 1 to the SWZ. 4. The contracting authority does not envisage the award of additional contracts, as referred to in Article 388, point 2, lit. b of the PZP Act. 5. The contracting authority has taken due care to eliminate all proprietary names from the contract documents. If, however, the contract documents contain indications of trademarks, patents, or origin, source, or a particular process that characterizes the products or services supplied by a specific Contractor (proprietary names) and the contracting authority has not specified the criteria for equivalence, as referred to in Article 99, paragraph 6 of the PZP Act, they should be treated as non-existent. In connection with the above, the contracting authority does not require the subject of the contract to be implemented using the specified materials and products. Therefore, a Contractor who offers to implement the contract using other materials and products is not obliged to submit a description of equivalent materials and products. 6. In the event that the procurement documentation contains references to standards, technical assessments, technical specifications and technical reference systems, as referred to in Article 101, paragraph 1, point 2 and paragraph 3 of the PZP Act, equivalent solutions are permitted. In the event of an offer of equivalent solutions, the Contractor is obliged to submit, together with the offer, a description of the equivalent solutions and to demonstrate that they meet the requirements specified by the contracting authority. Whenever references to standards, technical assessments, technical specifications and technical reference systems appear in the description of the subject of the contract, the phrase "or equivalent" is added after their wording. 7. In accordance with Article 393, paragraph 1, point 4 of the PZP Act, the contracting authority will reject an offer in which the share of products originating from Member States of the European Union, from countries with which the European Union has concluded agreements on the equal treatment of entrepreneurs, or from countries to which the provisions of Directive 2014/25/EU are applied by virtue of a decision of the Council, does not exceed 50% of the total value of the products covered by the offer. 8. The contracting authority will reject an offer in which the share of products (parts and components) in each of the delivered buses originating from countries that are parties to the GPA Agreement concluded within the World Trade Organization (WTO) on government procurement and that have concluded free trade agreements with the European Union covering the provisions on public procurement does not exceed 50%. 9. The project is co-financed under the programme Fundusze Europejskie dla Pomorza Zachodniego 2021-2027, Priority 3 Fundusze Europejskie na rzecz mobilnego Pomorza Zachodniego Action 3.1 Clean urban transport (ZIT). 10. In accordance with the rules governing the expenditure of funds, EU funds, inter alia, aim to implement a strategy for intelligent, sustainable growth conducive to social inclusion. These objectives are achieved through the expenditure of funds in a manner that ensures, inter alia, the creation of high-quality jobs, or environmental protection. 11. Contracts will be awarded in a manner that ensures the best results, including social, environmental or economic results, if any of these results can be achieved in the given contract, in relation to the costs incurred, in accordance with the horizontal rules. 12. The main objective of the project is to ensure a good transport offer, guaranteeing safety and travel comfort while simultaneously limiting the negative impact of transport on the environment through increased use of modern low-emission urban transport. 13. Detailed objectives of the project: 1) successive implementation of sustainable transport solutions in the functional area of the city; 2) reduction of pollutant emissions into the atmosphere; 3) improvement of accessibility of rolling stock for people with disabilities; 4) improvement of air quality in the project's area of influence; 5) reduction of the risk of climate-related diseases. 14. In accordance with Articles 256 and 257 of the PZP Act, the contracting authority envisages the possibility of invalidating the procurement procedure: 1) before the deadline for submitting offers, if circumstances arise that make it unjustified to continue the procedure, 2) if the public funds that the contracting authority intends to allocate to finance the whole or part of the contract have not been granted to it. 15. Reasons for not dividing the contract into lots: In accordance with Article 362, point 1 of the PZP Act, Article 91, paragraph 2 of the PZP Act does not apply to the award of sectoral contracts, nevertheless the contracting authority informs that it has not divided the contract due to the fact that the subject of the contract covers the delivery of 4 new factory-made MIDI-class, zero-emission, low-noise, low-floor electric buses and 1 mobile charger – 60 kW. The subject of the contract forms one technologically interlinked system, the functioning of which requires full compatibility. Dividing the contract into lots could lead to technical inconsistencies. The lack of comprehensive implementation of the contract could threaten its proper execution. Furthermore, the contracting authority would have difficulties in enforcing the rights arising from the warranty/guarantee – for defects, inter alia, due to the possibility of declaring different warranty/guarantee periods and the possibility of transferring responsibility to another Contractor. The lack of division of the contract into lots does not limit competition and ensures equal access for entities from the sector of small and medium-sized enterprises. 16. In order to properly prepare the offer and estimate the costs of service implementation, the contracting authority, due to the specificity of the subject of the contract, recommends carrying out a local visit.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Firefighting vehicles – Zamawiający: Ochotnicza Straż Pożarna w Międzyrzeczu Górnym, Międzyrzecze Górne 175, 43-392 Międzyrzecze Górne
Ochotnicza Straż Pożarna w Międzyrzeczu GórnymPolandFirefighting vehiclesDeadline in 25 daysPublished on Nov 19, 2026
Poland – Road signs – Dostawa tarcz, słupków i obejm do znaków drogowych w 2027 r. – zamówienie udzielane w częściach
Zakład Remontów i Konserwacji DrógPolandRoad signsDeadline in 4 daysPublished on Nov 19, 2026
Poland – Firefighting vehicles – Dostawa fabrycznie nowego ciężkiego samochodu ratowniczo - gaśniczego z napędem 4x4
Ochotnicza Straż Pożarna w Grodźcu ŚląskimPolandFirefighting vehiclesDeadline in 25 daysPublished on Nov 19, 2026
Poland – Crane and dumper trucks – Dostawa, w formie leasingu operacyjnego z opcją wykupu, samochodu ciężarowego o dmc 26 ton z urządzeniem hakowym
Zakład Komunalny Sp. z o.o. w OpoluPolandCrane and dumper trucksFinancial leasing servicesDeadline in 38 daysPublished on Nov 19, 2026