Romania – Road construction works – Execuție lucrări privind obiectivul de investiție ”Modernizare DJ 595 D Moșnița Veche-Giroc”
Description
This procurement concerns the modernisation works of the existing county road DJ 595D, which runs through both intra- and extra-urban areas, with a length of 12,090 m (12.09 km) and ensures the connection between the localities of Moșnița Veche and Giroc, as well as a new connection with the Timișoara Ring Road (VTM). The duration of the works is 36 months from the date of issuance of the order to start the works by the beneficiary, in accordance with the award documentation. The modernisation works include the following types: A. Road works - modernisation of the county road with one traffic lane per direction; - arrangement of 10 roundabouts - bicycle paths - pavements - intersections with side roads and streets; - property accesses; - bus stops; - parking lots; - implementation of rainwater collection and drainage devices; - implementation of culverts; - road safety elements; B. Railway works Works necessary for the modernisation of the level crossing with the railway CF 125 Timișoara - Buziaș, at km 9+701.10: - installation of elastic slabs at the ends of the elastic slabs related to the modernised TN; - connection of the outer TN slabs with the modernised pavement; - placement of parapets at the boundary between the carriageway and pavement; - installation of the train approach signalling system without half-barriers of the SAT type; - relocation of the TTR pole from the km 8+607 area on which the FO route is mounted C. Electrical installations - lighting of roundabout intersections D. Natural gas transport works - replacement of the natural gas distribution network and the branches connected to these networks, which supply the existing buildings on the sector of the county road DJ 595D under design - protection of the natural gas transport pipelines DN 200 Foieni - Timișoara I and DN 400 Timișoara I - Timișoara III, in accordance with the project “Protection of existing natural gas transport pipelines DN 200 Foieni - Timișoara I and DN 400 Timișoara I - Timișoara III, at the intersection with DJ 595D, Moșnița Veche - Giroc, Timiș County” E. Telecommunications works - implementation of an underground infrastructure consisting of HDPE/PVC tubes and communication shafts for the safeguarding of underground and aerial telecommunications networks and ensuring the connection to the communications network of future subscribers. The works will be carried out in accordance with the provisions of the Technical Project prepared by the design firm – SC Iriconstruct SRL, and the Building Permit No. 7 of 26.05.2026 issued by the Timiș County Council. The contracting authority will respond clearly and completely to all requests for clarification/information, on the 12th day before the deadline set for the submission of tenders, provided that the requests are made at least 22 days before the deadline set for the submission of tenders. Clarifications submitted after this deadline will no longer be considered. The total estimated value of the works execution contract is 119,041,724.00 lei, excl. VAT, and does not include the value of "miscellaneous and unforeseen expenses" (estimated at 10% of the total value).
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Construction, foundation and surface works for highways, roads – Lucrări aferente obiectivului de investiție „Reabilitare DJ 125, km 0+000-18+943”
JUDETUL HARGHITARomaniaConstruction, foundation and surface works for highways, roadsEngineering-design services for traffic installationsTechnical assistance servicesDeadline in 27 daysPublished on Oct 15, 2026
Romania – Roadworks – Execuție lucrări la obiectivul de investiții "Reabilitare şi modernizare DJ 244K: DN 24 (Muntenii de Sus) – Tanacu – Bălţaţi – Crăsnăşeni – Leoşti – Vineţeşti – Olteneşti – Zgura, L=19,000 km", Lot nr.2 si Lot nr.3
JUDETUL VASLUIRomaniaRoadworksDeadline in 37 daysPublished on Oct 15, 2026
Romania – Electrical installation work – Modernizare sistem comandă control protecţie stația 220/110 kV Peștiș
COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE "TRANSELECTRICA" S.A. - STT TimişoaraRomaniaElectrical installation workDeadline in 58 daysPublished on Oct 15, 2026
Romania – District-heating mains construction work – Servicii de proiectare şi Execuţie lucrări pentru obiectivul: “Creșterea producției de energie din resurse geotermale prin realizarea/modernizarea capacităților de producție și a rețelelor de transport – distribuție a energiei termice din energie geotermală”
Orasul CalimanestiRomaniaDistrict-heating mains construction workHeating equipmentDrilling and exploration workDeadline in 37 daysPublished on Oct 15, 2026