France – Installation of telecommunications equipment – Etudes & travaux pour la réalisation des lignes expérimentales E HSL EUROLINK Phase 1.2 & MELUSINA 2026-2029
Description
Within a few years, the GSM-R (2G) network will be replaced by the FRMCS (5G) network to ensure the communications and data transmissions of railway traffic. SNCF Réseau has launched projects to experiment with this future network on two lines:
- The 5G HSL EUROLINK project will test the new network on the LGV Nord (line 226000). It consists of two initial phases:
+ Phase 1.1 (excluded from this contract)
+ Phase 1.2 over approximately 90 km
- The 5G MELUSINA project, for the French part, concerns the Metz-Luxembourg section of line 180000.
+ Single phase over approximately 50 km
To ensure coverage of these lines, the FRMCS network can rely on the existing GSM-R infrastructure. However, it also requires new high points, interspersed between the GSM-R sites, to meet its performance objectives. The present contract is composed of 2 lots:
- Lot 1: 5G HSL EUROLINK Phase 1.2
+ 13 FRMCS sites to be built, including the high point and the technical area
+ 13 technical areas to be installed near existing GSM-R or MNO sites
- Lot 2: 5G MELUSINA
+ 4 FRMCS sites to be built, including the high point and the technical area
+ 8 technical areas to be installed near MNO or GSM-R sites
+ 1 technical area to be installed on a terrace to be built near the existing GSM-R site
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Application work of protective coatings – Programme de réfection de la protection anticorrosion d'ouvrages d'art 2027 - SANE Lot 1 - Travaux de réfection de la protection anticorrosion du PI 218.3 sur l'A16 - centre de Wailly-Beaucamp 2027
SANEFFranceApplication work of protective coatingsScaffolding workScaffolding dismantling workDeadline in 43 daysPublished on Oct 28, 2026
France – Installation of traffic monitoring equipment – Réalisation du Contournement Ouest de Montpellier – Equipements dynamiques
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceInstallation of traffic monitoring equipmentInstallation of illuminated road signsInstallation of traffic lightsDeadline in 35 daysPublished on Oct 28, 2026
France – Restoration work – Réhabilitation de 100 logements individuels Résidence DIXMUDE CHERBOURG-OCTEVILLE (50460)
SOC HLM DU COTENTINFranceRestoration workFacade workRoof-covering workDeadline in 29 daysPublished on Oct 28, 2026
France – Miscellaneous special-trade construction work – 2026FOUR001NTE
Université Gustave EiffelFranceMiscellaneous special-trade construction workBuilding demolition and wrecking work and earthmoving workRoof insulation workDeadline in 36 daysPublished on Oct 28, 2026